Effective Teamwork in Construction Bids: A Comprehensive WBS Overview
This document explores the dynamics of teamwork among four individuals—Joan Chen, Faye Wong, Bruce Lee, and CoCo Lee—focusing on a Work Breakdown Structure (WBS) for successful bidding in construction. It details the various trades involved, such as electrical, HVAC, plumbing, masonry, and carpentry. Each segment emphasizes the importance of dissecting tasks like excavation, roofing, and installations to generate accurate cost estimations and profit margins. Learn how organized group efforts can enhance bidding success and project execution.
Effective Teamwork in Construction Bids: A Comprehensive WBS Overview
E N D
Presentation Transcript
Wbs, CONTRACTORS & GIVING A BID TCU VIA – S19 4th Semester introduction Group- / Teamwork WBS – Work Break downStructure Contractors / Trades Costs + Profit / Margin The Bid
GROUP- / TEAMWORK 4 individual persons Joan Chen Faye Wong Bruce Lee CoCo Lee One unit WBS
Wbs - Scrutinizingthe revit model Set-up site Takedownsite Roofs Water installations Ventilation Heat installations Ceilings Tilework Subfloorsfor tiles Sanitary Plumbing Sewersystem Outer walls Partition walls Woodenfloors Subfloors for Woodenfloors Windows Stair Deck elements Power instalaltions Electric equipment Caseworks (kitchen and cabinets) Removingsoil Excavation Grass, bushes & trees Externaldoors Internaldoors Foundations Ground-surportedfloors WBS
Wbs - Trades / CONTRACTORS Electrical Works Carpentery Works Sanatary & Ventilation Works Landscape Works Concrete Works Masonry Works Concrete Elements Works Roofs Ceilings Woodenfloors Subfloors for Woodenfloors Windows Externaldoors Internaldoors Stair Caseworks (kitchen and cabinets) Set-up site Takedown site Removingsoil Excavation Grass, bushes & trees Outer walls Partition walls Tilework Subfloorsfor tiles Deck elements Concrete elements Power instalaltions Electric equipment Foundations Ground-surportedfloors Sanitary Plumbing Sewersystem Ventilation Water installations Heat installations WBS
Group- / teamwork Electrical Works Carpentery Works Sanatary & Ventilation Works Landscape Works Concrete Works Masonry Works Concrete Elements Works Roofs Ceilings Woodenfloors Subfloors for Woodenfloors Windows Externaldoors Internaldoors Stair Caseworks (kitchen and cabinets) Set-up site Takedown site Removingsoil Excavation Grass, bushes & trees Outer walls Partition walls Tilework Subfloorsfor tiles Deck elements Concrete elements Power instalaltions Electric equipment Foundations Ground-surportedfloors Sanitary Plumbing Sewersystem Ventilation Water installations Heat installations Distribute the work evenly in the group WBS
Group- / teamwork Electrical Works Carpentery Works Sanatary & Ventilation Works Landscape Works Concrete Works Masonry Works Concrete Elements Works Costprice Costprice Costprice Costprice Costprice Costprice Costprice TOTAL COST PRICE + Profit / Margin THE BID WBS
GROUP- / TEAMWORK One unit WBS
Questions? Functionalanalysis VIA University College