1 / 15

Aerial View July 2010 – Project Site Overview

Aerial View July 2010 – Project Site Overview. Pump Station Outlet Side August 2010. Pump Station Intake Side August 2010. Pump Station Intake Side August 2010. Sluice Gate Outlet Side August 2010. East T-Wall Flood Side August 2010. Access Bridge August 2010. Sector Gate August 2010.

Télécharger la présentation

Aerial View July 2010 – Project Site Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aerial View July 2010 – Project Site Overview

  2. Pump Station Outlet Side August 2010

  3. Pump Station Intake Side August 2010

  4. Pump Station Intake Side August 2010

  5. Sluice Gate Outlet Side August 2010

  6. East T-Wall Flood Side August 2010

  7. Access Bridge August 2010

  8. Sector Gate August 2010

  9. Sector Gate August 2010

  10. Sector Gate August 2010

  11. 404C T-Wall August 2010

  12. 404C / WCS August 2010

  13. King Fab Horizontal Girder August 2010

  14. King Fab Needle Beam August 2010

  15. King Fab Truss Pipes August 2010

More Related