1 / 10

MRF workshop, Prague, Eli Beamlines 05.05.2014

Paul Scherrer Institut. Babak Kalantari (Controls). SwissFEL Timing System. MRF workshop, Prague, Eli Beamlines 05.05.2014. SwissFEL Machine. 1st phase 2013-16. 2 nd phase 2018-19?. Athos 0.7-7nm. Linear accelerators C-Band technology. user stations. Photocathode RF gun.

bina
Télécharger la présentation

MRF workshop, Prague, Eli Beamlines 05.05.2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Paul Scherrer Institut Babak Kalantari (Controls) SwissFEL Timing System MRF workshop, Prague, Eli Beamlines 05.05.2014

  2. SwissFEL Machine 1st phase 2013-16 2nd phase 2018-19? Athos 0.7-7nm Linear accelerators C-Band technology user stations Photocathode RF gun 2.6-3.4 GeV Injector Linac 1 Linac 2 Linac 3 3.0-5.8 GeV BC1 0.38 GeV 3.0 GeV BC2 2.1 GeV Aramis 0.1-0.7 nm SwissFEL parameters Wavelength from 1 Å - 70 Å Photon energy 0.2-12 keV Pulse duration 1 fs - 20 fs e- Energy 5.8 GeV e- Bunch charge 10-200 pC Repetition rate 100 Hz Bunch per pulse single/double Bunch spacing 28ns 740m Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  3. Timing Distribution Network Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  4. SwissFEL Event System • Event clock 142.8 MHz, 7ns, (specifies delay and event positioning resolution) • Sequence trigger and (re)programming at 100 Hz • Fan-out/concentrator: 70 (full-duplex1-to-8 ; VME) • EVG: 1, • EVR: 150 VME, 90 PCIe, 20 PMC (or XMC) • Direct event stream 100 (decode event stream on custom H/W, i.e., embedded EVR) • Synchronized timestamping • Exploits synchronous data capability for real-time communication for • reliable distribution of machine parameters, e.g., pulse ID • reliable (and limited) distributed controls, e.g., synchronous DAQ Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  5. Machine Operation (Timing view) Mixed of several repetition rates: • Master rate triggers (fixed 100Hz) some subsystems (of e.g., Laser, RF) require trigger at every pulse • Machine rate triggers (variable ≤ 100Hz, e.g., 50Hz) due to lack of performance, available power, radiation budget, etc. • Beam rate triggers (variable ≤ 100Hz, e.g., 10Hz, 1Hz, single-shot, …) every pulse in which beam is expected; intentionally reduced beam rate for machine protection or development, etc.; can include laser subsystems, diagnostic systems, etc. Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  6. Machine Protection System (MPS) interface • Delay shift mechanism to generate beam blackout pulse with beam pulse without beam • TL in green is the trigger with normal delay; leads to beam generation (Beam Ok) • TL in red is the with shifted delay; leads to beam blackout (Beam Not ok) • shift of ~ 10 us to Gun RF; why delay shift? continues triggers maintain machine stability • Required actions: • Delay shift occurs immediately for selected triggers • Beam status has to be reliably distributed (Beam (Not) Ok) Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  7. Machine timing operation modes • General timing question for every system at each (100Hz) pulse: • Should this system be triggered? determined by Event rate • Should the trigger delay be shifted? determined by MPS or user’s demand • What is beam status? whether or not beam will be produced • Combining (a) , (b) and (c) leads to several operation modes: • Why on-demandGun RF delay shift? machine conditioning without beam, e.g., startup • Why on-demandLaser delay shift? dark current measurement (without shutter control) Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  8. Machine timing modes, cont’d Some consequence: • It must be possible to force on-demand shifted delay locally & individually per system • MPS alarm must override local demand of shifted delay • Beam status (signal/info) is a global machine status to be distributed reliably: • Known ahead of time if caused by on-demand shifted delay (easy) • Otherwise, unknown until MPS processing time is finished (difficult) Additional feature: • Emulation of MPS alarm internally in timing system (e.g., test or simulation purposes) Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  9. Thanks! Babak Kalantari (PSI); MRF workshop, Prague, Eli Beamlines, 05.05.2014

  10. Short list of requirements Incomplete list; suggests some implementation ideas too • Event clock 142.8 MHz • Continuous drift compensation; long term drift < 0.7ns peak-peak • Delay shift mechanism (controlled by DBUS / events / both ??); must allow enable/disable and local/manual control • Sequence event masking (in/out) controlled int./ext. • Data buffer transmit upon int./ext. H/W trigger (in addition to S/W trigger) • Distribution (fan-out) monitoring (VME bus interface) • Upstream data (and event) broadcasting by EVG without S/W intervention • Stimulate delay shift mechanism at EVG internally in addition to external MPS alarm

More Related