1 / 13

Astana , 2011

Astana , 2011. Oil and Gas Ministry of the Republic of Kazakhstan «20 years of energy industry’s development of the Republic of Kazakhstan . Achievements. Problems. Prospects ». Recoverable reserves of liquid hydrocarbons and gas. * Mineral reserves’ balance state data of the RK. Slide 1.

blaze
Télécharger la présentation

Astana , 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Astana, 2011 Oil and Gas Ministry of the Republic of Kazakhstan «20 years of energy industry’s development of the Republic ofKazakhstan. Achievements.Problems. Prospects»

  2. Recoverable reserves of liquid hydrocarbons and gas *Mineral reserves’ balance state data of the RK Slide 1

  3. Proved oil reserves Oil world resources on1st January, 2011(bln. tons) Источник: BP Statistical Review of World EnergyJune 2011

  4. Oil and Gas production

  5. Current and future projects Current projects: 1 «Tengiz» oil field(Lukarco, KMG, ExxonMobil, Chevron)2. «Kashagan» field(AgipCaspian Sea B.V., KMGKashagan B.V., ConocoPhillips North Caspian Ltd., ExxonMobil Kazakhstan Inc., Inpex North Caspian Sea Ltd., ShellKazakhstan Development B.V., Total E&P Kazakhstan)3. «N» section (ConocoPhillips N Block B.V., MDK (Oil and Gas N BlockKazakhstan) GmbH, KMG)4. «Zhemchuzhina» section(OMAN OIL, KMT, SHELL)5. «Satpaev» section (KMG, ONGС Videsh Ltd.)6. «Zhambyl» section (KMG, Korean national company) Planned projects:1. «Abai» section(KMG, Statoil)2. «Hvalynsk» oil field(KMG, «Lukoil» JSC)3. «Central» oil field (KMG, «Lukoil» JSC, «Gazprom» JSC)

  6. Gas utilization Oil and gas production and flared gas capacity dynamics for the period from 2006 to 2010.

  7. Pipeline infrastructure Приморск РОССИЯ Бутинге Atyrau-Samara ЛИТВА Гданьск БЕЛАРУСЬ Самара Плоцк Atasu - Alashankou ПОЛЬША stana ГЕРМАНИЯ Броды KAZAKHSTAN УКРАИНА CPC 1 Кенкияк Атасу Ескене 3 3 Атырау Кумколь 2 Одесса РУМЫНИЯ Алашанькоу Тенгиз Кашаган 5 Махачкала Актау Новороссийск Констанца 4 ЧЕРНОЕ МОРЕ Eskene - Kuryk БОЛГАРИЯ Супса Узбекистан Курык Бургас Самсун Кыргызстан 5 Влера Александруполис КИТАЙ Туркменистан Баку КCST ТУРЦИЯ KTI Джейхан Нека ИРАН СРЕДИЗЕМНОЕ МОРЕ Current export route: 1 – Atyrau-Samarа 2 – Caspian pipeline consortium 3 – Kenkiyak-Kumkol-Atasu-Alashankou 4 – Aktau harbor (Makhachkala, Baku, Neka) Plannedexport route: 5 – Kazakhstan Caspian system of transportation

  8. Oil export

  9. Internal oil supply Cargo on the Oil refinery of the RK(thousandtons)

  10. Domestic Gas supply Domestic consumption of natural gas for 1991, 2011 years and forecast for 2020

  11. Gasified areas map showing gas pipelines Territories gasified with natural gas Petropavlovsk Kostanai Pavlodar 51,8% Astana Uralsk Aktobe Ust-Kamenogorsk 63,9% Karaganda 81,2% MGBuhara-Ural MGCAC о. Балхаш 89,4% MGB-B-Sh Atyrau 13,9% 23,5% Horgos MGPKaz-Kit 39,8% 48,3% 58,6% Kyzylorda Taldykorgan Almaty Aktau MGBGR-TBA 99,6% Taraz MGKCKungard Кыргызстан Узбекистан Shymkent Китай 9 out of 14 regions of the RK gasified with natural gas Туркменистан Slide 10

  12. Investment projects of modernization and creation of the refineries and petrochemical plants • «Reconstruction and modernization of Atyrau Oil refinery», including «Construction of the  aromatics production complex on the Atyrau oil refinery» (133 thousand tons a year -benzol, 496 thousand tons a year - paraxeyene); «Construction of the high refined complex on the Atyrau oil refinery» • «Reconstruction and modernization of Pavlodar PCP» • «Reconstruction and modernization ofPCOP Oil refinery» (Shymkent Oil refinery) • «Construction of integrated chemical complex», including I phase –polypropylene production (500 thousand tons a year ); II phase – polyethylene prodction (800 thousand tons a year) • «Production of paving bitumen on Aktauplast refinery» (more than 400 thousand tons a year)

  13. Thank you for your kind attention!

More Related