SlideServe
Menu
Préférences
© SlideServe · v2026

Drawing release Management ELECTRONIC drawing release

bob avatar
10 diapositives · 359 Views · Aug 22, 2014

Drawing release Management ELECTRONIC drawing release. Derek Gasch Total Quality Management. Project Description. Purpose Replace the antiquated procedures in place for paper-based drawing release with new procedures that utilize the technology of Computer Aided Design (CAD). Problem.

Drawing release Management ELECTRONIC drawing release - slide 1
01 / 10Drawing release Management ELECTRONIC drawing release
1 / 17

Télécharger la présentation

Drawing release Management ELECTRONIC drawing release
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Drawing release ManagementELECTRONIC drawing release Derek Gasch Total Quality Management

  2. Project Description • Purpose • Replace the antiquated procedures in place for paper-based drawing release with new procedures that utilize the technology of Computer Aided Design (CAD).

  3. Problem • Current work-flow requires the printing of hundreds of 24”x36” prints every month. • Why is this a problem? • Time • Costs • Waste • Errors

  4. Problem: Time • The required to print, sign and fold prints averages to about 4 minutes per vessel drawing. • To issue a drawing the designer must: • Publish a DWF File of Drawing • Print Drawing • Retrieve Drawing • Sign Drawing • Fold Drawing • Print Calculations • Retrieve Calculations • Sign Calculations • Group Drawing and Calculations • Put in mail-box • Send E-mail Notifications

  5. Problem: Costs, Waste and Errors • Paper ($109.50) • Ink ($230.00) • Maintenance • The more it is used, the more it breaks. • Errors • It is difficult to keep drawing users up-to-date when drawing revisions are made. • Manufacturing a product off of old / incorrect drawings.

  6. Methodology • Most of the suggested procedure is based on knowledge of the software, industry, equipment and the needs of the drawings consumers. • Research was used as a means to support existing ideas and to help develop new ones. • Electronic Drawing Release • Built-in Functionality • DWF File Format

  7. New Procedure • The suggested procedure reduces the number of steps by 50% and the amount of engineering department drawing release time by 75%. • Publish a DWF File of Drawing • Stamp Drawing with Signature • Publish Calculations • Stamp Calculations with Signature • Send E-mail Notifications

  8. Side-by-side comparison • Publish a DWF File of Drawing • Stamp Drawing with Signature • Publish Calculations • Stamp Calculations with Signature • Send E-mail Notifications • Publish a DWF File of Drawing • Print Drawing • Retrieve Drawing • Sign Drawing • Fold Drawing • Print Calculations • Retrieve Calculations • Sign Calculations • Group Drawing and Calculations • Put in mail-box • Send E-mail Notifications Current Process New Process

  9. Conclusion • The best solution for drawing release is to publish DWF files to a commonly accessible network folder. • Network permission • Password protection for individual files • Electronically sign with actual signature • E-mail notification of drawing issued • Consumer can print as need

  10. Questions?