1 / 28

, experience at the Israeli Meteorological Service

, experience at the Israeli Meteorological Service. Yoav Levi, Head R&D. 77 IMS personnel. 2012 IMS News. New data policy - the IMS stopped selling products (data and forecasts), as all IMS budget is covered by the government.

bozica
Télécharger la présentation

, experience at the Israeli Meteorological Service

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. , experience at the Israeli Meteorological Service Yoav Levi, Head R&D

  2. 77 IMS personnel

  3. 2012 IMS News • New data policy - the IMS stopped selling products (data and forecasts), as all IMS budget is covered by the government. • Less employees for public services and more for research. R&D from 5 to 8 employees. • A new HPC.

  4. SGI HPC with 1024 cores 32 nodes of 2 AMD 16 core Opteron6276 processors

  5. HPC performance

  6. IMS Research & Development

  7. NWP at IMS • IMS runs WRF, HRM and testing COSMO. • IMS has decided to join COSMO and use it operationally for forecasting duties and upgrade our NWP skills. • 2 young FTE’s and a consultation from Dr. Shimon Krichak from the Tel-Aviv Uni. (50%).

  8. 2012 Research • MSG - Land Surface Temperature (LST) and IR to evaluate frost and cloud fraction in partial filed pixels (replace human observations). • Could it be relevant for Soil and Surface working group (WG3b), conditional verification (WG5)?

  9. Where vegetation is enhanced evapo-transpiration reduces temperatureCOSMO_LST > MSG_LST

  10. After Dry Season Tel Aviv 70 km Jerusalem

  11. At springwith~2 octas

  12. INCA-Integrated Nowcasting through Comprehensive Analysis. • NWP interpolated and adjusted to 1 Km grid together with 85 AWS observation. • Could it be relevant for Km-Scale Ensemble-Based Data Assimilation (KENDA), grid verification(WG5)?

  13. Wind energy atlas 2013 - COSMO 2.8 km as input to a micro-scale model

  14. Forecast verification comparing to Bet Dagan Radiosond -IT DA?

  15. 60 hour average RMSE for T2m Tel Aviv 20km 16km 7km 7km 12km 14km

  16. : T2m : COSMO-IT : 12Z+18h : Bet Dagan near Tel Aviv Model (oC) Observations (oC) Frequency of events (%) התפלגות השגיאות : RMSE2 = STD2 + MBE2 Temperature error (oC)

  17. RMSE for 12Z runsCOSMO-ITBet Dagan RMSE (oC) Forecast range (hr) Large RMSE at 06Z

  18. Last 7 Days bias correction Frequency of events (%) No correction 7 days bias correction Temperature error (oC) RMSE (oC) Decrees RMSE Forecast range (hr)

  19. Bet Dagan – near Tel aviv כל המודלים RMSE W/O correction 6Z RMSE(oC) ECMWF 18Z UKMO CO-IT CO-IL 12Z Forecast range (hr) 213/263 events

  20. Bet Dagan – near Tel aviv כל המודלים RMSE after bias correction RMSE(oC) ECMWF UKMO CO-IT CO-IL Forecast range (hr)

  21. Summery for Temperature verification

  22. COSMO-IL, nocturnal RH 10% underestimation

  23. COSMO underestimates humidity!& misses fog AWS obs.

  24. We live in a dry environment but COSMO makes it worse! CO-IT – icbc from ECMWF CO-IL – icbc from GME CO CO CO obs obs obs obs obs CO CO

  25. Summary, IMS experience with • Good Temperature and wind forecasts. • Underestimation of Relative Humidity and fog appearance. • Strong underestimation of precipitation. • Hopefully we will mange together to improve COSMO skills in the future.

  26. Israeli Meteorological Service Thanks

More Related