1 / 16

Ponds 6, 7 & 8

Ponds 6, 7 & 8. Napa Sonoma Marsh Restoration Group Meeting USGS San Pablo Field Station Office, Building 505, Mare Island September 26, 2006. Presentation. Project Overview Upper Ponds (8 & 7/7A) Goals and Solutions Ponds 6/6A Goals and Solutions Geotechnical Investigation and Survey

Télécharger la présentation

Ponds 6, 7 & 8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ponds 6, 7 & 8 Napa Sonoma Marsh Restoration Group Meeting USGS San Pablo Field Station Office, Building 505, Mare Island September 26, 2006

  2. Presentation • Project Overview • Upper Ponds (8 & 7/7A) Goals and Solutions • Ponds 6/6A Goals and Solutions • Geotechnical Investigation and Survey • Schedule

  3. Location Map

  4. Existing Conditions • Situated on former Napa River floodplain • Current Flow from Pond 8 to Ponds 7/7A to Ponds 6/6A • Pond 7 Bittern

  5. Upper Ponds (8 & 7/7A) System Goals: • Perimeter Levee Improvement • Internal Levee Improvement (wave run-up) • Reduce Pond 7 Salinity to Acceptable Level • Mix Pond 7 Bittern with Tidal Flows in Mixing Chamber • Increase Tidal Flows to Mixing Chamber • New Outfall for Mixing Chamber Discharge into Napa Slough

  6. Upper Ponds (8 & 7/7A) System Solution Options: Option 1: • Increase Flow to Pond 8 From Mud Slough • Improve System to Allow Increased Flows to Mixing Chamber Option 2: • Find Alternate Source for Mixing Chamber Source Water • Mud Slough Finger Into Pond 7A

  7. Upper Ponds (8 & 7/7A) System Design Components: • Perimeter Levee Improvement • Internal Levee Improvement • Mixing Chamber Design • New Discharge Pipe/Control Structure at Napa Slough • New System to Increase Tidal Flows to Mixing Chamber

  8. Ponds 6/6A Goals: • Perimeter Levee Improvement • Internal Levee Improvement • Demolish Siphon from Ponds 7/7A • Decrease Residence Time (one week)

  9. Options: • New Intake from Napa Slough • New Intake/Outfall at China Slough (south side) • New Control Structure through Internal Levee • Outfall to Devil’s Slough • Outfall to Little Island Farms Ponds 6/6A

  10. Design Components: • Perimeter Levee Improvement • Raise Internal Levee & Fix Breach • Demolish Siphon from Ponds 7/7A • New Systems to Improve Residence Time Ponds 6/6A

  11. Geotechnical and Survey Scope Geotechnical: • Levee Walk to Assess Conditions • Geotechnical Scope for Upcoming Investigation Survey: • Field Survey to obtain Bathymetry and Topography for Design

  12. Geotechnical InvestigationPond 8

  13. Geotechnical InvestigationPond 7/7A

  14. Geotechnical InvestigationPond 6/6A

  15. Ongoing Tasks • Finalize Geotechnical and Survey Scope • Alternatives Analyses • Complete Geotechnical Investigation • Complete Survey • Plans to 50% - February 2007

  16. Questions