Piquet Report

Piquet Report. Alessandro Cardini 21-29 May 2012. Monday 21 st. GEM current problem present: starting analysis  Occasional M1 timing alarms in presenter Hole in M1A-18A1 FEBs 16, 17, 18 Strange histograms from THR scan Oleg manually set THR to 80: initially all ok, now situation is bad

brice
Télécharger la présentation

Piquet Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Piquet Report Alessandro Cardini 21-29 May 2012

  2. Monday 21st • GEM current problem present: starting analysis  Occasional M1 timing alarms in presenter • Hole in M1A-18A1 FEBs 16, 17, 18 • Strange histograms from THR scan • Oleg manually set THR to 80: initially all ok, now situation is bad • Very few in-time hits, but all counts is only half the “good” FEBs… • One gap in M5A27_gapC (ABCD) almost in short • 7 gaps tripped – excluded • Fill 2649 (7h17’): integrated luminosity ~ 9.6 pb-1

  3. Tuesday 22nd • Configuration problem of some boards on C side – restart required at beginning of fill #2651 • Performing some 1% GEM gas variations to measure current sensitivity to gas mixture composition (nominal is Ar/Co2/CF4 45/15/40): • nominal  45/16/39  46/15/39  nominal • Preparing • 8 gaps tripped – excluded • Fill 2651 (19h35’): integrated luminosity ~ 24.77 pb-1 (finished 23rd early morning) A. Cardini / INFN Cagliari

  4. Wednesday 23rd • Oleg performed a small time correction on a few channels(https://lblogbook.cern.ch/MUON/3404) • 4 gaps tripped – excluded • Fill 2653 (0h36’): integrated luminosity ~ 0.61 pb-1 • Fill 2657 (5h58’): integrated luminosity ~ 8.02 pb-1 A. Cardini / INFN Cagliari

  5. Thursday 24th • GEM gas sampling pipes in UXA-A3 and –A1 connected • Starting gas chromatography • No tripped gaps • Fill 2658 (1h21’): integrated luminosity ~ 1.70 pb-1 • Fill 2660 (1h12’): integrated luminosity ~ 1.30 pb-1 A. Cardini / INFN Cagliari

  6. A. Cardini / INFN Cagliari

  7. Friday 25th • @15:00: access (https://lblogbook.cern.ch/MUON/3416): • M5A_27A_gapC disconnected • GEM LV problems on M1A18A1 FEBs 16, 17,18: checked LV cables on M1A-18A1 regulators: found two power cable ~disconnected • 3 gaps tripped – excluded • Fill 2663 (11h20’): integrated luminosity ~ 15.45 pb-1 A. Cardini / INFN Cagliari

  8. Saturday 26th • Optimizing GEM working point: new settings is 3x415V (+5V increase) https://lblogbook.cern.ch/MUON/3419 • 2 gaps tripped – excluded • Fill 2669 (8h12’): integrated luminosity ~ 8.34 pb-1 A. Cardini / INFN Cagliari

  9. Sunday 27th • No beam due to cryo failure • GC measurements on GEM gas continue in UXA-A1 (but will have to wait for Roberto for the analysis): • Fresh gas coming from SG building • Return mix from A and C side, with and without beam A. Cardini / INFN Cagliari

  10. Monday 28th • Cryo recovered (Sunday ~23:00) • New timing recipes for M1R1 loaded by Sandro: -1.5 ns global shift as suggested by Giacomo. Available from fill 2672 • Some more GEM HV tuning: increase transfer fields from 3.0 to 3.5 kV/cm (to be performed) • 3gaps tripped – excluded • Fill 2670 (1h14’): integrated luminosity ~ 1.54 pb-1 • Fill 2671 (7h13’): integrated luminosity ~ 9.65 pb-1 • Fill 2673 (2h46’): integrated luminosity ~ 3.22 pb-1 A. Cardini / INFN Cagliari

  11. Tripped Gaps A. Cardini / INFN Cagliari