20 likes | 122 Vues
Piquet report (01.09-08.09.2008). a lot of errors in ectell03: board replaced by Stephane 05.05 errors at configuring EC11FEB14 04.09 (message 1058 in SHIFT logbook): - SPECS errors (Frederic) - did not happen again
E N D
Piquet report (01.09-08.09.2008) • a lot of errors in ectell03: board replaced by Stephane 05.05 • errors at configuring EC11FEB14 04.09 (message 1058 in SHIFT logbook): - SPECS errors (Frederic) - did not happen again • several interventions at ECAL towards installation of capacitors on MV lines: - first 80 patches gave positive effect (see slides of Irina) - the rest were installed today (many thanks to Pascal, Vladimir Obraztsov and Evgeny!!!). The effect to be checked Yu. Guz 08/09/2008
Piquet report 2 TED runs, 05.09 and 06.09. SPD, PRS and HCAL were on Yu. Guz 08/09/2008