CS 425/625 Software Engineering Software Testing

CS 425/625 Software Engineering Software Testing. Based on Chapter 20 of the textbook [Somm00] Ian Sommerville, Software Engineering, 6 th Ed., Addison-Wesley, 2000 and on the Ch20 PowerPoint presentation available at the book’s web-site:

btowns
Télécharger la présentation

CS 425/625 Software Engineering Software Testing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CS 425/625 Software EngineeringSoftware Testing Based on Chapter 20 of the textbook [Somm00] Ian Sommerville, Software Engineering, 6th Ed., Addison-Wesley, 2000 and on the Ch20 PowerPoint presentation available at the book’s web-site: www.comp.lancs.ac.uk/computing/resources/IanS/SE6/Slides/index.html November 12, 2002

  2. Outline • Introduction • Defect Testing • Black Box Testing • Equivalence Partitioning • Structural (White Box) Testing • Path Testing • Integration Testing • Top-Down • Bottom-Up • Interface Testing • Stress Testing • Object Oriented Testing

  3. Introduction.. • A very high level view of testing phases [Fig. 20.1, Somm00]

  4. .Introduction. • Component testing is concerned with checking the functionality of methods, classes, and modules • Integration testing focuses on sub-systems and their interaction as well as on the operation of the system as a whole • Component testing is individual programmers’ task while integration testing is assigned to an integration team • For critical systems independent testing teams are used during all testing • Integration testing is based on written requirements specifications

  5. ..Introduction • In object-oriented testing the boundaries between component and integration testing are blurred because • Object-oriented systems do not have the clear distinction between program units and program modules characteristic to structured (function-oriented) systems • The hierarchy of objects is not necessarily “nested”

  6. Defect Testing • Defect testing is aimed at discovering errors in code • A successful defect test causes the system to perform incorrectly • During the testing process the following are created: • Test cases • Test data • Test reports

  7. Defect Testing • Comprehensive testing is not possible. Subsets of tests cases are designed based on criteria such as: • All code statements should be executed at least once • All functions accessed through menus should be tested • All combinations of functions accessed through the same menu should be checked • All user input situations should be checked with both correct and incorrect data

  8. Defect Testing: The Process • The defect testing process [Fig. 20.2, Somm00]

  9. Defect Testing: Black Box Testing. • In black box testing (or functional testing) the system is viewed from “outside,” only in terms of its functionality • The software is tested against its specification • Internal (implementation) details are ignored • The behavior of the system is evaluated in terms of inputs received, outputs expected, and outputs actually produced • A defect is discovered if the actual system output differs from the expected output • Applicable to both function-oriented and object-oriented systems

  10. Defect Testing: .Black Box Testing • The black-box testing model [Fig. 20.3, Somm00]

  11. Defect Testing: Equivalence Partitioning…. • Equivalence partitioning makes use of classes of input test data (e.g., positive numbers, negative numbers, strings, etc.) • Generally, systems tend to behave in a comparable way for all members of a class • Classes of input test data are called equivalence partitions or domains • Equivalence partitions are determined based on program specification and user documentation; • Test cases are derived for each equivalence partition • Partition mid-point and boundary values provide useful test data

  12. .Defect Testing: .Equivalence Partitioning… • Equivalence partitioning [Fig. 20.4, Somm00]

  13. ..Defect Testing: Equivalence Partitioning.. • Equivalence partitions [Fig. 20.5, Somm00]

  14. …Defect Testing: Equivalence Partitioning. • Example: A search routine [Fig. 20.6, Somm00] procedure Search (Key : ELEM ; T: ELEM_ARRAY; Found : in out BOOLEAN; L: in out ELEM_INDEX) ; Pre-condition -- the array has at least one element T’FIRST <= T’LAST Post-condition -- the element is found and is referenced by L ( Found and T (L) = Key) or -- the element is not in the array ( not Found and not (exists i, T’FIRST <= i <= T’LAST, T (i) = Key ))

  15. ….Defect Testing: Equivalence Partitioning • Equivalence partitions for search routine [Fig. 20.7, Somm00]

  16. Defect Testing: Structural Testing…. • In contrast to black box testingstructural testing(orwhite box, clear box, glass box testing) is based on the knowledge the testers have about the structure and the implementation of the software • Applied generally to smaller program units • The tester analyzes the code to determine test cases • Types of structural testing: • Branch coverage: every branch of the unit is tested at least once • Statement coverage: every statement of the unit is executed at least once • Path coverage: every path through the unit is executed at least once

  17. .Defect Testing: Structural Testing… • The structural testing process [Fig. 20.8, Somm00]

  18. Structural Testing Example Java implementation [Fig. 20.9, Somm00]

  19. Defect Testing: …Structural Testing. • Equivalence classes for binary search [Fig. 20.10, Somm00]

  20. ….Defect Testing: Structural Testing • Test cases for binary search [Fig. 20.11, Somm00]

  21. Defect Testing: Path Testing… • Path testingis a form of structural testing aimed at exercising each individual execution path of a program unit. It ensures that • Each statement of the unit is executed at least once • Each branch condition is tested with both true and false conditions • The program flow graph is used for path testing. In a flow graph decisions are shown as nodes and the flow of control is represented by edges

  22. Defect Testing: .Path Testing.. • The cyclomatic complexity CC of a connected graph G is given by the formula: CC(G) = Number of edges - Number of nodes + 2 • If there are no go to statements and no compound decisions (involving more than one test) then CC(G) = Number of predicate nodes + 1 (predicate nodes contain conditions that determine branching of the execution flow) • The cyclomatic complexity of a graph gives the minimum number of test cases needed to cover all paths

  23. Defect Testing: ..Path Testing. • Flow graph for binary search [Fig. 20.12, Somm00]

  24. Defect Testing: …Path Testing • Independent paths in previous case 1, 2, 3, 8, 9 1, 2, 3, 4, 6, 7, 2 1, 2, 3, 4, 5, 7, 2 1, 2, 3, 4, 6, 7, 2, 8, 9 • In programs with complex branching structure the number of paths is high and it is often difficult to predict the program’s behaviour • A dynamic program analyzer can be used to identify all paths

  25. Integration Testing.….. • Integration involves building sub-systems from program units and the system from subsystems • Integration testing uses software specifications as basis for checking the system • Errors are more difficult to locate than in unit testing • The incremental approach is recommended for system integration and testing • Initially, a minimal system configuration can be used • Tests need be repeated after each addition to the system

  26. .Integration Testing….. • Incremental integration testing [Fig. 20.13, Somm00]

  27. ..Integration Testing…. • Strategies for system integration and testing: • Top-Down • Starts with high level components and continues at lower levels • Integral part of the top-down development process • Stubs are needed to test the system

  28. …Integration Testing… • Strategies for system integration and testing [cont’d]: • Bottom-Up • Starts with lower level components and builds up the system by adding & testing higher level components • Can be used when components from previously developed systems are reused or when the system’s functionality relies on critical lower level modules • Driver modules are used to test the system • “Sandwich” • Combines the above two strategies by using the Top-Down approach for logic modules (higher level) and the Bottom-Up approach for operational (lower level) modules

  29. ….Integration Testing.. • Top-down integration testing [Fig. 20.14, Somm00]

  30. …..Integration Testing. • Bottom-up integration testing [Fig. 20.14, Somm00]

  31. …...Integration Testing • Top-Down versus Bottom-Up: • Architectural validation • Top-Down allows earlier discovery of high-level design errors • System demonstration • Top-Down supports better an early demo; Bottom-Up can support such demo if many reusable components are utilized • Test implementation • Strict Top-Down testing is more difficult to implement given that stubs are needed. It is easier to use drivers in a strict Bottom-Up testing • Test observation • Equally challenging, since both stubs and drivers may not allow complete observations

  32. Interface Testing… • Interface testing has the goal of detecting errors related to interfacing modules and sub-systems • Particularly important for object-oriented testing given objects’ collaboration relies on their interfaces • Types of interfaces: • Parameter interfaces • Shared memory interfaces • Procedural interfaces • Message passing interfaces • Classes of interface errors: • Interface misuse • Interface misunderstanding • Timing errors

  33. .Interface Testing.. • Interface testing [Fig. 20.15, Somm00]: tests directed at the sub-system as a whole, not at particular components

  34. ..Interface Testing. • Guidelines for interface testing • Test all external calls with parameters at extreme ranges • When pointers are used, test interfaces with null pointers • For procedural interfaces try to design tests that would cause the components to fail • Use stress testing for message passing interfaces • Change activation order of components that share memory

  35. …Interface Testing • Stress testing exercise the systems with overloading(e.g., number of transactions per minute, number of users in a distributed applications) • The main purposes of stress testing: • Make sure the system does not lose or corrupt data when overloaded • Reveal defects that otherwise would pass unnoticed

  36. Object-Oriented Testing.. • Differences from function-oriented systems: • Objects are usually larger units, which encompass several methods • Objects are typically loosely coupled and there may not be an obvious high top of the class hierarchy • Testers may not have access to the code of reused objects

  37. .Object-Oriented Testing. • Levels of testing in object-oriented testing: • Testing operations of object classes (sequences of operations may be needed) • Testing object classes (operations, attributes, and states) • Testing clusters of objects (use case or scenarios based testing; thread testing, etc.); each operation in each class should be checked at least once • Testing the object-oriented system

  38. ..Object-Oriented Testing • Compared with testing function-oriented systems, testing of object-oriented system is facilitated by inheritance + reuse (previously tested objects) but specific challenges exist because: • Information hiding is a complicating factor • Writing additional methods (invoked for testing purposes only) are often necessary • New and overwritten methods must be tested • Inherited methods must still be re-tested if they interact with newly written methods