An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Station Control and Optimisation Anna Aslanyan Quantitative Finance Centre BP

  2. Background • Tolling (spark/dark spread) agreements widespread in power industry • Both physical and paper trades, usually over-the-counter • Based on the profit margin of a power plant • Reflect the cost of converting fuel into electricity • Physical deals facility-specific • Pricing often involves optimisation

  3. Definitions • Optimisation problem referred to as scheduling (commitment allocation, economic dispatch) • Profit is the difference between two prices (power and fuel), less emissions and other variable costs • The latter include operation and maintenance costs, transmission losses, etc. • Objective function similar to a spread option pay-off

  4. Definitions (contd) Examine power, fuel and CO2 price forecasts and choose top N MWh to generate, subject to various constraints, including • volume (load factor) restrictions • operational constraints • minimum on and off times • ramp-up rates • outages Apart from fuel and emissions costs, need to consider • start-up costs • operation and maintenance costs

  5. Motivation Trading of carbon-neutral spark spreads of interest to anyone with exposure to all three markets • Attractive as • speculation • basis risk mitigation • asset optimisation tools • Modelling required to • price contract/value power plant • determine optimal operating regime and/or hedging strategy

  6. Commodities to be modelled • Electricity • demand varies significantly • sudden fluctuations not uncommon • hardest to model • Fuel (gas, coal, oil) • sufficient historical data available • stylised facts extensively studied • Emissions • new market, just entered phase two • participants’ behaviour often unpredictable • prices expected to rise

  7. Methodology outline • Given forward prices for K half-hours and a set of operational constraints, allocate M generation half-hours, maximising profit or, equivalently, minimising production costs C • A. J. Wood, B. F. Wollenberg Power Generation, Operation, and Control, 1996 • S Takriti, J Birge, Lagrangian solution techniques and bounds for loosely coupled mixed-integer stochastic programs, Operations Research, 2000 • combination of two techniques, dynamic programming and Lagrangian relaxation

  8. Dynamic programming • Forward recursive DP formalism implemented to solve Bellman equation • Given an initial state, consider an array of possible states evolving from it • States characterised by • cost • history • status • availability

  9. Dynamic programming (contd) • Ensure that only feasible transitions are permitted • if the plant is on, it can • stay on if allowed by availability • switch off if reached minimum on time • otherwise, it can • stay off • switch on if allowed by availability and reached minimum off time • Update the cost for each of these transitions • Maximise the profit over all possible states at every stage

  10. Lagrangian relaxation • Define combining • cost function C • penalty (Lagrangian multiplier) • actual number of half-hours, m and maximum to be allocated, M • Solve primal problem for a fixed • Update to solve dual problem • Iterate until duality gap vanishes

  11. Lagrangian relaxation (contd) • Initialise and its range • Update to move towards along a subgradient • Anything more suitable for mixed-integer (non-smooth) problems?

  12. Lagrangian relaxation (contd) • Solution sub-optimal (optimal if using DP alone) • Can be partly improved by redefining the ‘natural undergeneration’ termination condition • Further optimisation may be required, for example over outage periods

  13. Summary • Understanding of tolling deals provides market players with • alternatives to supply and/or purchase power • risk-management instruments • power plants valuation tools • ability to optimise power plants • competence necessary to participate in virtual power plant (VPP) auctions • Large dimensionality requires fast-converging algorithms