1 / 41

Gujarat “ Survey Using Electronic Total Station (ETS) and Global Positioning System (GPS)” Technology Fair- New Delhi .

Gujarat “ Survey Using Electronic Total Station (ETS) and Global Positioning System (GPS)” Technology Fair- New Delhi . 15 -12- 2009. Experiences from States . Presented By : A. Bhattacharyya , I.A.S. , Principal Secretary ( Land Reforms ) & Settlement Commissioner &

cala
Télécharger la présentation

Gujarat “ Survey Using Electronic Total Station (ETS) and Global Positioning System (GPS)” Technology Fair- New Delhi .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gujarat “ Survey Using Electronic Total Station (ETS) and Global Positioning System (GPS)” Technology Fair- New Delhi . 15 -12- 2009 Experiences from States

  2. Presented By : A. Bhattacharyya, I.A.S. , Principal Secretary ( Land Reforms ) & Settlement Commissioner & Director of Land Record, Gujarat State.

  3. VISION • To undertake detailed resurvey in Gujarat and create updated land records including textual and spatial information • Enabling establishment of a system which will help in the continued maintenance of updated land records • Provide ready and smooth access to required information to all stakeholders

  4. Background of Land Survey in Gujarat…. • Gujarat State is pioneer in the country having it’s survey records up to land parcels known as Tippans • Land Survey was carried out long ago by Britishers and old Princely States of Gujarat during 1880 to 1915 . • The object of the survey was to collect Land Revenue from the owner of land in proportion to the area they held. • As per The Bombay Land Revenue Code, 1879 survey should have been conducted after 30 years of original survey.

  5. Land Record Information in Gujarat • Current Scenario….. • The Government, through its organization, performs mainly two functions: • Maintenance and updationof land records (textual records, including village form No. 6 ( Hakpatrak ) and Village Form No. 7/ 12 (Satbara) and Spatial records namely village maps and field measurement books commonly known as Tippans in rural areas.- • Maintenance and updationof the textual and the spatial records in urban areas. The textual record is commonly known as Property Card.

  6. Need for Advanced Survey Technology • The survey records are outdated • About 20 - 25% of the records have also been lost / destroyed / mutilated. • Old survey was carried out using conventional instruments available at that time – (5% Tolerance limit was allowed ) • Inaccurate records • Documents in poor shape and not available at all.

  7. Original Tippan ( Field MeasurementRecord – unscaled)

  8. Enlarged Tippan ( Field MeasurementRecord – scaled / digitized) * Chain - Anna Survey No. 63 * Meter-CM N

  9. Old Village Map (Interacting & Overlapping) As per Map As per possession & benchmark As per benchmark of S.No.1 S. no.1 Overlapped Area

  10. Gujaratpioneer introducer • Gujarat is pioneer in introducing modern survey technology • ETS since 1990-1991 • GPS since 1999-2000 • Using this ETS technology approx. 250 villages have been re-surveyed • Using GPS technology approx. 30000 hectares of land have been surveyed in Gujarat

  11. GIS ready Digitized New Village Map

  12. ETS & GPS Survey Machinery

  13. What is Electronic Total Station Machine • ETS is an new generation modern survey • instrument. • It is an optical theodolite combined with Electronic Distance Measurement ( EDM ) instrument and a mini computer which is helpful in collecting data of; • Distance • Angle • Height. • ETSreads, records & displays horizontal and vertical angle digitally. It stores the data in its internal data recorder. Precision of the instrument varies between 1“ to 7” (Seconds )

  14. What is Electronic Total Station Machine …. • Within the overall objective of XYZ data, the following 12 kinds of detailed data are also displayed • HA = Horizontal Angle • VA = Vertical Angle • AZ = Azimuth or bearing • SD = Slope distance • HD = Horizontal distance • VD = Vertical distance • N = Northing • E = Easting • Z = Elevation • Code = Feature Code • 11. Time • 12. Point No = Serial Point No.

  15. What is GPS ? • Global Positioning System (GPS) is satellite navigation system • It is based on a constellation of 24 satellites orbiting around earth at a very high altitude, • The system can be used to measure position of the object on the earth surface in a continuous measures • This Mapping Datum created known as World Geodetic System -84 ( WGS-84)

  16. SATELLITES AVAILABLE FOR G.P.S. SERVICE

  17. GPS Measurements We are somewhere on this sphere • GPS is based on satellite • ranging, measuring distance from Satellite • Second measurements put us somewhere on this circles & narrows down our location • By third measurements we get accurate location

  18. Steps initiated by Department

  19. Steps initiated by Department…

  20. Action Plan for Resurvey using high end technology

  21. Use of ETS & GPS in Re –Survey Jamnagar District - A Case Study • Establishment of GPS Ground Control network • Z Value Validation – MSL Data from Survey of India • Detailed survey of each land parcel with ETS • Generation of all District, Taluka, Village and Land Parcel Map with Latitude / Longitude and Z data. • Distribution of land parcel map to every land holder along with validation • Preparation of allied land records and promulgation of record.

  22. Gujarat State

  23. Jamnagar District Total Area : 14,125 Sq. K.M. No. of Talukas : 10 No. of Villages : 695 No. of Land Parcels : 4,46,030 + sub divisions

  24. Establishment of Ground Control Network by DGPS

  25. Establishment ofGPSGround Control Network, Accuracy and Destination

  26. Grid Generation (State Level – 16 x 16 Kms) Primary

  27. Grid Generation (State Level - 16x16 Kms)… Primary control Jamnagar Dist. 16 x 16 K.M.

  28. Secondary Control Grid Generation (Dist. Level – 4 x 4 Kms)… 4x4 KM

  29. Another view of Grid Generation (District Level – 4 x 4 Kms)…

  30. New Land Parcel Map જિ. જામનગર સરવે ન. 132 તા. કાલાવડ ગામ કાલાવડ ધાક. મગનભાઇ નાનજીભાઇ મહેતા With Lat / Long & Dimension સરવે મામલતદાર, જિ.જામનગર

  31. Outcomes expected from Jamnagar Resurvey • Geodetic network with co-ordinates and sketch of the control points showing their description and location. • District map, taluka maps, village maps and Land Parcel Maps with lat-long. • The map projection and coordinates of the control points will be WGS 84 datum based • Seamlessly mosaiced district digital database with layers of various topographical details & GIS. • Digitized copies of the Village maps showing features like Survey No. , Name, Chalta No. will be obtained • National level unified Village code • Village map as per National mapping policy & land use pattern with unique feature code will be obtained.

  32. Few examples of success stories of Survey Work using GPS & ETS technology

  33. Banni Protected Forest Area Dist. Kutch , Gujarat • Biggest grassland of Asia • Area as per survey 2503 Sq. K.M. • Total villages 42 • Periphery 362 K.M. • Time taken to complete 32 working days • Surveyors 10 surveyor 1 supervisor

  34. ajsdjkvbKJSDBvckjaBSDvb Banni Protected Forest Survey Carried out by DISRA & DILR Kutchh

  35. Port. Chanch ,Taluka Rajula Dist. Amreli • Area of GPS survey including coastal area – 5000 + Hectare. • Time taken to complete 9 working days • Surveyors 4 surveyor 1 supervisor

  36. Chanch Port Survey Survey Carried out by DISRA & DILR Amreli

  37. Dholera Port. SIR Area Bhavanagar Dist. • Infrastructure project like SEZ port, Ultra mega Power project and New international Airport • Area of survey 11433 Hectare • Total villages 7 • Time taken to complete 20 working days • Surveyors 10 surveyor 1 supervisor

  38. D H O L E R A P O R T S I R S U R V E Y SIR SURVEY Survey Carried out by DISRA & DILR Bhavanagar

  39. GIFT CITY, Gandhinagar • Gujarat International Financial Tech City • Biggest infrastructure project in Gujarat • Capital investment of Rs. 1,00,000 + Crore • 300 70 + storied High rise buildings • Area of survey 500 Hectare • Total villages 3 • Time taken to complete 20 working days • Surveyors 5 surveyor 1 supervisor

  40. GIFT CITY AREA Survey Carried out by DISRA & DILR Gandhinagar

  41. Thank You! -Himanshu Dalwadi

More Related