This document outlines the Environmental Heavy Cost Investments Planning (EHCIP) Project, executed from November 2003 to November 2005 by the Republic of Turkey's Ministry of Environment and Forestry. It details the methodology for project selection through public consultations and extensive stakeholder engagement, resulting in the identification and prioritization of six demonstrative investment projects in air quality, wastewater treatment, and solid waste management. The subsequent prioritization studies conducted in 2006-2007 expanded the pipeline to include 131 projects, enhancing Turkey’s environmental infrastructure.
E N D
Republic of Turkey Ministry of Environment and Forestry A National Prioritized Project Pipeline and Environmental Operational Program
Background Environmental Heavy Cost Investments Planning (EHCIP) Project (Nov. 2003 – Nov. 2005): Investment Packages Component of the project: • Long list of the projects collected through questionnaires • 2 widely participated workshops (April 2004 and June 2005) from all the relevant stakeholders including governmental organizations, NGOs, universities, municipalities • "Project Ranking Methodology“ and "Project Prioritization Manual“ were identified. • Screening and ranking of the projects • Selection of the 6 demonstrative investment projects (solid waste, waste water, air quality) under EHCIP Project Republic of Turkey Ministry of Environment and Forestry
Background – EHCIP Project Selection of 6 Demonstrative Project: Request for projects for pipeline Response rate 50%=>250+ project ideas Screening:EU relevanceCommenced? Revise method&Ranked list Stakeholderworkshop Project rankingmethodology 12 projects”suitable” 6 out of 12selected Pre-appraisalof16 projects Republic of Turkey Ministry of Environment and Forestry
The process Systematic Rational Stakeholder involvement Free from political interference Background – EHCIP Project Assessment of Prioritization under EHCIP Project: Results: The six highest ranked projects • Air (1) Karabük AQ management project (No investment component) • Water (2) Nevşehir WWTP project (2006 Program) Tokat WWTP project (2006 Program) • Waste (2) Çanakkale SWM Project (2005 Program) Kuşadası SWM Project (2005 Program) • Industrial Pollution Control (1) Dilovası OID Pollution Control Project (under tendering through external credit) Republic of Turkey Ministry of Environment and Forestry
Background New Prioritization Study (2006-2007): • Questionnaires were sent to 450 municipalities over 50.000 populations (census 2000) and about 300 applications were received. • Complementary data from İller Bank, TurkStat, SPO, DSI, Treasury. • The same screening and ranking criteria as defined by EHCIP Project Figure 1: Distribution of the project proposals Republic of Turkey Ministry of Environment and Forestry
Screening and Ranking Criteria 1) National Project Prioritization List A. Screening Criteria B. Ranking Criteria
RESULTS - Prioritized Pipeline • After the screening, the national prioritized pipeline is composed of totally 131 projects; • 61 wastewater projects • 52 solid waste projects • 18 drinking water projects • Finally, 3 separate sectoral pipelines for; - wastewater, - drinking water, - solid waste. Figure 2: Distribution of the ranked projects **The final pipeline is published as sectoral ranking lists in the website of the MoEF (www.did-cevreorman.gov.tr). Also, a Final Report on the prioritization study is published on the website.
RESULTS – Indicative List of Major Projects • An indicative shortlist of the prioritized major projects (>10 M€) is annexed to Environmental Operational Program (OP-Env) for 2007-2009 period with the relevant financing tables • Technical Assistance Projects are being undertaken to prepare IPA investment packages for the projects in the indicative list of OP-Env.
ENVIRONMENT OPERATIONAL PROGRAM State of Play with EOP: • EOP sets the Program Strategy and Financial Plan for environment sector under IPA Program for 2007-2009 Period. • Final Draft of Environment OP was submitted to the European Commission in October 2007. • Approval of EOP is expected by the end of 2007.
EOP – PROGRAM STRATEGY Priority Axes: Priority Axis 1:Improvement of water supply, sewerage system and wastewater treatment Measure 1.1:Imrpovement of water supply quality Measure 1.2:Improvement of recieving body quality Priority Axis 2:Development of integrated solid waste management Measure 2:Increasing of waste recycling and improvement of sanitary landfill systems
EOP – PROGRAM STRATEGY Priority Axes: Priority 3: Technical Assistance Measure 3.1: Enhancing the management of Environment Operational Program Measure 3.2: Enhancing the planning capacities of the Final Beneficiaries
INDICATIVE MAJOR PROJECTS • Priority 1: • 12 Wastewater Projects • 4 Drinking Water Projects • Priority 2: • - 10 Solid Waste Projects
Republic of Turkey Ministry of Environment and Forestry Thank you for your attention