Wake-field Monitor Development

Draft proposal for a task within RF work-package of EuCARD-II. Wake-field Monitor Development. Partners: CERN, PSI + others ?. Linear colliders and X-ray Free Electron Lasers require good control of wake-fields. Long range wakes suppressed by HOM damping and detuning (CLIC).

cardea
Télécharger la présentation

Wake-field Monitor Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft proposal for a task within RF work-package of EuCARD-II Wake-field Monitor Development Partners: CERN, PSI + others ? Linear colliders and X-ray Free Electron Lasers require good control of wake-fields. Long range wakes suppressed by HOM damping and detuning (CLIC). Short range wakes driven by beam to structure alignment. Alignment can be determined by coupling to the wakes. → Wake Field Monitor. 1. CERN developing prototype X-band structures for wake-field experiments on FACET 2. PSI/ST/CERN developing X-band structure for longitudinal beam dynamics for SwissFEL and Trieste FEL. 3. Wake-field monitor under design at CEA.

  2. WP tasks • Design and fabricate multi-purpose RF Front Ends for WFM. • Should be easily adaptable to different frequencies; 15 GHz, 18 GHz, 24 GHz • Build hard-ware for CTF3 and SwissFEL injector. • Design and fabricate alternative WFM(s) for other structures • (collaboration with CERN). • 3. Test and commission the different RFFE and pick-ups with beam at CTF3 and • SwissFEL injector. Resources: Hardware: 6 RFFE ~ 120 kE; WFM ~ 80 kE. Manpower (PSI): Scientist/engineer 6 months, post-doc 2 years, technician ~ 2 years. + CERN manpower (?) Participating laboratories: CERN, PSI Infra-structures involved: CTF3, SwissFEL Injector