Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011

Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011. James B. Florence ANS-3.5 Chair. ANS-3.5 Topic Overview. Introduce ANS-3.5 Working Group ANS-3.5 WebPages Recent ANS-3.5-2009 Clarifications ANS-3.5-201X Revised Scope Focus Areas for ANS-3.5-201X

carmelita
Télécharger la présentation

Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Plant Simulation Conference 2011 Tampa, Florida February 16, 2011 James B. Florence ANS-3.5 Chair

  2. ANS-3.5 Topic Overview • Introduce ANS-3.5 Working Group • ANS-3.5 WebPages • Recent ANS-3.5-2009 Clarifications • ANS-3.5-201X Revised Scope • Focus Areas for ANS-3.5-201X • ANS-3.5 Standards Adoption History • Q&A with ANS-3.5 Working Group

  3. ANS-3.5 StandardWorking Group Membership Officers • Jim Florence (Cooper) – Chair • Bob Felker (Western Services Corp.) – Vice Chair • Keith Welchel (Oconee) – Secretary • Butch Colby (L3 MAPPS) – Editor • SK Chang (Millstone) – Style Editor • Larry Vick (NRC) - Parliamentarian

  4. ANS-3.5 StandardWorking Group Membership • Robert Goldman (Grand Gulf) • David Goodman (Comanche Peak) • Dennis Koutouzis (INPO) • Jody Lawter (Summer) • George McCullough (GSE) • Mac McDade (Harris) • Michael Petersen (Monticello/Prairie Island) • Pablo Rey (Tecnatom – Spain) • James Sale (North Anna) • Frank Tarselli (Independent)

  5. ANS-3.5 Working GroupCrystal River – January 2011

  6. ANS-3.5 WebPages • The ANS-3.5 WebPages can be accessed via: • www.ans.org • www.usug.org • Find: • Scope Statement • Membership Contact Information • Meeting Locations • Meeting Minutes • Link to ANS-3.5 Clarifications • How to submit clarification requests

  7. Recent ANS-3.5-2009Clarifications Recent clarifications are posted at: http://www.new.ans.org/standards/clarifications/

  8. ANS-3.5-201X Scope Revised Scope (pending approval of ANS-21 & NFSC): • This standard establishes the functional requirements for full scope nuclear power plant control room simulators that are subject to U.S. Nuclear Regulatory Commission (NRC) regulation for use in operator training and examination. The standard also establishes criteria for the scope of simulation, performance, and functional capabilities of nuclear power plant control room simulators. This standard does not establish criteria for the use of simulators in operator training programs.

  9. Focus Areas forANS-3.5-201X • Define the Term Training Needs Assessment in such a manner that it is clear in intent to both Training and Simulator staff • Performance Test Program • Review Malfunction List • Define Testing Periodicities • Limits of Simulation • Steady-State & Normal Evolutions • Malfunctions • Physical Fidelity & Human Factors • Instructor Station • Real Time & Repeatability

  10. Focus Areas forANS-3.5-201X • Non-fully integrated performance testing • Next generation simulators • Configuration Management • Uses of simulators for other than operator training & examination • Consider international community needs • Address experience requirements & reactivity control manipulations

  11. Focus Areas forANS-3.5-201X • Identify areas in the standard to address DCS • Address other simulation devices derived directly from the full scope control room simulator • Cyber security guidance • Initial Condition development criteria for performance tests

  12. ANS-3.5 StandardsAdoption History • A Full History of Full Scope Nuclear Power Plant (NPP) Simulators as related to the ANSI/ANS-3.5 Standards • Earliest NPP Simulators were constructed upon specifications only (through the '70s) • General Electric (Dresden 2) • Babcock and Wilcox (Rancho Seco) • Combustion Engineering (Calvert Cliffs) • Westinghouse (Zion) • Indian Point 2 (Consolidated Edison of New York)

  13. ANS-3.5 StandardsAdoption History • The age of utility-owned Simulators began in the late '70s (ConEd – Indian Point 2) • The '80s was the time of a utility-owned Simulator for every unique reference unit • Simulators for the new Reactor phase are being purchased within the Nuclear Steam Supply System contract (all COLs applications are referenced to ANSI/ANS-3.5-1998) • New Reactor phase of Simulators are scheduled for delivery in order that operators can be trained and licensed before criticality

  14. ANS-3.5 StandardsAdoption History

  15. ANS-3.5 StandardsAdoption History

  16. Q&A with ANS-3.5 Working Group Questions?