1 / 36

Consortium Meeting 10/6/2011

Consortium Meeting 10/6/2011. Major Side News: Langley Hill Radar. Langley Hill Radar Operational. Fully operational INCLUDING dual-pol capability. Note: all of our regional radars will be dual-pol soon. Extraordinary view offshore and over the coastal zone

carolos
Télécharger la présentation

Consortium Meeting 10/6/2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Consortium Meeting10/6/2011

  2. Major Side News: Langley Hill Radar

  3. Langley Hill Radar Operational • Fully operational INCLUDING dual-pol capability. Note: all of our regional radars will be dual-pol soon. • Extraordinary view offshore and over the coastal zone • Now seeing things 200-250 miles offshore. • Will get dual-pol graphics online in next two weeks

  4. Radar • One major enhancement left on Nov 1: zero degree elevation angle (or close to it). Much more range and MUCH better low-level coverage. • This year will will begin assimilating the Langley Radar (and others) into our regional data assimilation system.

  5. Web Access Issues

  6. Hits

  7. Data

  8. Web Server is Bogging Down • The department web server is bogging down under an increased load. • Has occasionally caused degradation in access times for WRF model products • The Department is going to substantially upgrade the server and will pay for it (this is where the indirect costs go).

  9. Personnel Issues • Phil Regulski has left for the private sector ($$$ issues) a few weeks ago. Virtually no warning. • Mark Albright has increased his hours to take over Phil’s tasks for model interface/graphics issues. • Jeff Baars took over Seattle applications • Dave Ovens has taken over baby sitting the real-time EnKF system. • Short-handed now and will have to deal with that.

  10. Items Completed Since Last Meeting • The point and click, random selection capability, is operational for meteograms, soundings, and time-heights. Takes roughly 20 seconds to come up. • Will add 1.3 km when it is stabilized

  11. Major Upgrade This Summer • Added three new nodes (24 processors) and expanded the 1.3 km half-way to Missoula

  12. Major Upgrade 1 • Big problems. There was an incompatibility in the infiniband cards on the new nodes with those on the old nodes. • Had to return the motherboards and exchange for identical ones as the old machines with onboard infiniband. Big pain. • Problem was eventually solved with new cards and new domain went operational during the summer (0630).

  13. Improvements • Dropped terrain smoothing when we found another way to insure stability of 4/3 km runs—sound wave averaging option. (Had been smoothing the most severe terrain where we had the problems). • Added air quality page for 4/3 km resolution.

  14. Striation Problem Fix Striations in precipitation were found in the SW part of the domain

  15. Striation Problem • Confirmed by the WRF folks. • Turns out it originated in the new Kain-Fritsch convective scheme with shallow cumulus. • Tested the old Kain-Fritsch and new Grell convective scheme…problem went away and everything else looked similar. • Switch to old KF on August 30.

  16. Major Upgrade (2) • Ready for the push of the 4/3 km to Missoula. • Also moving the 4/3 farther out into the Pacific to alleviate problems with the boundary being too close to the WA coast. • Also increased the 12 and 4-km domains to allow this. • Have added 4 new 12-core nodes. Total processors that we will run is 136 (11x8 + 4x12). Not long ago we were running 30-40 processors! • The new units are working well and scaling—timing should be very similar to current smaller domain.

  17. March 11

  18. July 11

  19. October 11 Major Lesson: Need to get upstream boundary away from our areas of interest

  20. New 1.3 km domain

  21. Land Mask

  22. Land Use

  23. Terrain

  24. Some Examples

  25. Major coastal improvements

  26. Much Better Coverage for W. Entrance to the Strait

  27. New RAID data server • We are rapidly running out of space with new graphics and the HUGE new domain. • Purchased a new data server and will install as soon as 4/3 km domain is stable next week. • Also does graphics generation. • Dual 6-core xeons with 48 gig of ram. We bought it with 12 2-TB drives running raid 6 for a total of 20TB usable space and dual-disk failure redundancy. It is expandable to 36 drives -> 34x2 or 68TB possible. • It also has a spare raid card as a backup and infiniband. • When this is up we will go forward with the graphics upgrades everyone wanted (some have been done though).

  28. Next Steps • OK to initiate expansion? • WSU and others ready for changes in 12, 4, and 1.3 km domains? • Next new RAID array. • Next new dept web server. • Next new graphics for 1.3 km and expansion of random selection to 1.3 km • Addition of radar to EnKF.

  29. Example other items • SNOWWATCH close to being ready to go.

  30. The END

More Related