An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAP C_TS422_2020 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions & Answers PDF For More Information: https://www.certswarrior.com/ Features: 90 Days Free Updates 30 Days Money Back Guarantee Instant Download Once Purchased 24/7 Online Chat Support Its Latest Version Visit us athttps://www.certswarrior.com/exam/c_ts422_2020/

  2. Latest Version: 7.0 Question: 1 You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 2 correct Answers to this question. A. Model a handling resource in the location master and goods receipt time in the material master. B. Model a separate resource in the production data structure. C. Model a resource inbound in the location master. D. Model a transportation resource in the location master. Answer: A,D Question: 2 Which of the following questions do you have to answer before you start creating a BOM? Note: There are 2 correct Answers to this question. A. What status does the BOM have? B. In which storage location is the BOM required? C. Which Valid To information is necessary? D. Is the material type allowed in the BOM? Answer: C,D Question: 3 How can SAP S/4HANA support a GMP-compliant production process? Note: There are 3 correct Answers to this question. A. GMP-compliant flag B. Recipe approval C. Batch record D. Digital signature E. Approved resources Answer: B,D Visit us athttps://www.certswarrior.com/exam/c_ts422_2020/

  3. Question: 4 An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version? A. MRP profile B. MRP group C. Plant parameters D. MRP controller Answer: B Question: 5 What determines whether the planned independent requirements in MRP are consumed by other requirements? A. Requirements profile B. Consumption sequence procedure C. Order type D. Requirements type Answer: D Question: 6 When working with both cross-plant and plant-specific material statuses in the material master, which status has the highest priority? A. The least restrictive status B. The most restrictive status C. The cross-plant status D. The plant-specific status Answer: B Question: 7 Visit us athttps://www.certswarrior.com/exam/c_ts422_2020/

  4. What type of time element can be reduced by strategy settings while dispatching? Note: There are 2 correct Answers to this question. A. Setup time B. Wait time C. Transport time D. Queue time Answer: D Question: 8 What are some uses for the low-level code assigned to each material? Note: There are 2 correct Answers to this question. A. It is used by product costing to determine how costs are rolled up. B. It is used by engineering to identify subitems in an engineering bill of material (BOM). C. It is used by ATP to determine the priority of alternative components. D. It is used in MRP to determine the sequence in which materials are planned. Answer: A,D Question: 9 Which methods are available for goods issue posting of material components for process orders? Note: There are 2 correct Answers to this question. A. Transfer order B. Kanban C. Picking list D. Backflushing Answer: A,D Question: 10 You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place? A. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation. Visit us athttps://www.certswarrior.com/exam/c_ts422_2020/

  5. B. The new operation is inserted at the desired time; the previously dispatched operation is moved forward. C. The new operation is inserted at the desired time; the previously dispatched operation is moved backward. D. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation. Answer: C Visit us athttps://www.certswarrior.com/exam/c_ts422_2020/

  6. http://www.certswarrior.com/ Questions and Answers (PDF) For More Information – Visit link below: http://www.certswarrior.com Disc ount Coupon Code: CERT SWARRIOR10 Page | 1 http://www.certswarrior.com/exam/M2180-651/ Visit us athttps://www.certswarrior.com/exam/c_ts422_2020/ Powered by TCPDF (www.tcpdf.org)