Monitoring, Reporting and Verification System (MRV) in Bangladesh

Monitoring, Reporting and Verification System (MRV) in Bangladesh. Md. Abdul Latif Mia 17 September 2014. Basic Facts. Population: 160 M Population Density: 1015 per sq KM Per capita GDP: 838 USD Area: 147,570 Sq KM Forest Area: 2.6 M Hectres GDP Growth Rate: 6%

chaman
Télécharger la présentation

Monitoring, Reporting and Verification System (MRV) in Bangladesh

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monitoring, Reporting and Verification System (MRV) in Bangladesh Md. Abdul Latif Mia 17 September 2014

  2. Basic Facts Population: 160 M Population Density: 1015 per sq KM Per capita GDP: 838 USD Area: 147,570 Sq KM Forest Area: 2.6 M Hectres GDP Growth Rate: 6% Total Emission: 59,608 Gg Emission from LUCF: 18,026 Gg

  3. MRV context of the Country National Forest Inventory (NFI): the previous NFI has not covered some forest type (the sampling strategy did not covered some forest types) Forest Monitoring System (FMS): one national forest cover assessment was performed (coarse resolution), and several sub-national land cover assessment (not compatible between each other) Green House Gas Inventory (GHG-I): mainly performed by contracting external resources

  4. 1. General aspects of the monitoring system Emission Factors There is no regular national forest inventory to provide emission factors

  5. Emission Factors – Methodology use for current estimation

  6. Experience at National Level • National Forest Inventory (NFI): • NFI conducted for the first time in 2005-06 • NFI has not covered some forest type (the sampling strategy did not covered some forest types) Source: NFA 2007

  7. Experience at Sub-national Level Detailed inventories were conducted in different forest types in different year under different project using different methodologies. They are: • Inventory of the Hill Forests (1958-60, 1984-85, 1996-97) • Inventory of the Plain land Sal Forests (1984-85, 1999-2001) • Inventory of the Sundarban Reserved Forests (1958-60, 1984-85, 1996-97) • Inventory of the Coastal Afforestation (1996-97)

  8. Activity data During the 1st and 2nd National Communication, Approach 1 (total area of each land category estimated, but area of conversions not provided, and non-spatial) was used for GHG reporting • Forest Monitoring System: • Project based monitoring • one national forest cover assessment was performed using the Landsat of 2004-05 • several sub-national assessment conducted under different project using different methodology in different time

  9. Experience at sub-national Level in Sundarban • Mid to very high resolution satellite imageries was used for the assessment of the forest areas in different times • SRF assessment and mapping was done using aerial photo of 1960, 1981, 1995 and IKONOS imagery of 2012 • No accuracy assessment was done

  10. Other experiences at Sub-national Level Assessment was done in different forest types using aerial photographs and satellite imageries in different year under different project. They are: • Assessment of the Hill Forests (part)(1958-60, 1998, 2013) (Aerial photo, SPOT 4, IKONOS and Rapid eye) • Assessment of the Plain land Sal Forests (1984-85, 2013) (Aerial photo and IKONOS) • Assessment of the Sundarban Reserved Forests (1960, 1985, 1998, 2013) (Aerial photo and IKONOS) • Assessment of the Coastal Afforestation (1992, 1997, 2013 ) (Aerial photo and Rapid eye) • Several other assessment was done for the protected areas using satellite imagery (Landsat, SPOT, LISIII, LISSIV, Geoeye)

  11. Future Plan - Successful implementation of the Readiness Preparation Proposal (R-PP)

  12. prior to R-PP development • Three national multi-stakeholder workshops • Five regional multi-stakeholder workshops • Village-level consultations • National ‘way forward’ workshop • About 700 individuals directly involved in consultations

  13. R-PP Approved by the Policy Board of UN-REDD Programme in December 2013 • R-PP included all the activities related to development of Emission factors and monitoring system • R-PP is used to develop the projects

  14. 2. Way forward for the development and implementation of MRV & monitoring • One project has been designed for the calculation of emission factor and generation of activity data with the help of Silva Carbon & FAO, is supposed to be started during the end of 2014 • Parallel Implementation of National Programme under UN-REDD Programme, is supposed to be started in October 2014 • capacity building for field inventory and geospatial data processing is on going activity under a project • sustainable support for the capacity building • flow of funding • Exchange of knowledge, views and experiences for the development of a operational MRV system

  15. Thank You