1 / 18

Sedimentshed Delineation

Sedimentshed Delineation. Chesapeake Bay Program Sediment Workgroup. Background: Current Sediment Cap Load Allocation. Understanding of… sediment sources and their impact on the Bay is not yet complete land based sediment and stream erosion is still basic

chapa
Télécharger la présentation

Sedimentshed Delineation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sedimentshed Delineation Chesapeake Bay Program Sediment Workgroup

  2. Background: Current Sediment Cap Load Allocation Understanding of… • sediment sources and their impact on the Bay is not yet complete • land based sediment and stream erosion is still basic • nearshore sediment transport from shoreline erosion and shallow-water resuspension is even more limited Therefore… • Sediment load allocations are currently focused on land based sediment loads by major trib basin Source: Setting and Allocating the Chesapeake Bay Basin Nutrient and Sediment Loads, 2003

  3. Background: Current Sediment Cap Load Allocation • Current water quality model is not capable of providing a reliable understanding of the sediment loads effect on water clarity (p. 104) • Since no reliable tool existed, sediment cap load allocations were based on reductions from implementing land-based phosphorus controls (p. 104) Source: Setting and Allocating the Chesapeake Bay Basin Nutrient and Sediment Loads, 2003

  4. Significance of Tidal Erosionin the Chesapeake (From Tidal Sediment Report)

  5. Sedimentshed • Definition: Area, including nearshore, that contributes the sediment loads that directly influences water clarity in specific adjoining shallow water habitats in a reasonable management timeframe • Purpose: Set appropriate geographic frame of reference for setting/revising sediment cap allocations by 2010 • Reasoning: Impacts from sediment on Bay water clarity and SAV growth are predominately localized (CBP, 2003)

  6. Area of influence • Shallow Sater SAV habitat– defined as the shallow-water SAV habitats most directly influenced by sediments from the surrounding sediment-shed (also called Designated Use Areas)

  7. Sedimentshed • Breaking new ground…

  8. Sediment Sources • Upland • Above fall line (sediment allocation defined in tributary strategies) • Below fall line (considered upland in model) • Shoreline and Bay • Shoreline erosion • Shallow water wave resuspension • Deep water resuspension (least important to SAV) • Resuspended primary producers (dead) in the water column • Oceanic Input

  9. Natural delineations of a Sedimentshed • It is expected that sediment sheds will likely be from single or multiple collections of CB segments • CB Segments group similar regions to define a range of objectives, target specific actions and monitor response (p. 1) • Hierarchy of considerations (p. 8) • Salinity (TF, OH, MH, PH) • Natural geographic partitions and features • Original segmentation boundaries Source: Chesapeake Bay Program Analytical Segmentation Scheme, 2004

  10. Questions to Group • Should we use the current model framework to identify sediment sheds? • What can we do with and what are the advantages with respect to sediment transport of the Phase V modeling framework in identifying sediment sheds? • What is the logical process to define a sedimentshed? • What can we do with the information currently available (independent of the WQM)? Meeting: 12/15/2005

  11. Sedimentshed - Proposed Approach • Define area of influence (SAV) • Locate ETM – Set “boundary” • Location? • Is it a true boundary? • Locate natural geographic partitions • Tribs to bay (CB Segmentation, 2004) • Compare WSM model segmentation with the new national watershed segmentation data • Locate nearshore vs. deep water • Model tracer study using only spike along shoreline? • Moving down the Bay • Sediment distribution (Newell et. al., 2004) • Soils (bottom type)

  12. Model Tracer Study • Phase V model framework • CBP modeling staff momentum is toward new model development • WSM accounts for the “partial area concept” • Suggested tracer scenarios • Above fall line (major tributary inputs) • Shoreline (high erosion areas) • Open bay • Set up future meeting to define scenarios and get committee agreement

  13. The ETM • Is it really a “boundary”? • Should it be an RFP? • Proposal: • Can we use the 20+ year record of TSS concentrations in tidal Bay waters in combination with the river flow record to determine is there a magnitude of storm event/level of river flow that disrupts the otherwise effective barrier in place with the estuarine turbidity maximum?

  14. The ETM - Cont • How much credit should ETMs be given for holding back sediments from upstream river basins? • Are there clear locations and documentation of the ETM locations? • Analysis by CBP in January and February • Report in the early spring 2006 • Require five independent reviewers

  15. Where do we go from here…

  16. Sediment Shed Report • Timeline: Dec 2005 – Dec 2006 • Assignment of sections??? • Proposed outline • Acknowledge the existing info on sediment transport and destination • Sediment shed • Definition • Natural “barriers” • Area of influence – shallow water habitat (SAV)

  17. Sediment Shed Report - Cont • Outline • Sediment mass balance • Sediment sources • Application of mass balance based on clarity • Tracer study • Design • Recommended scenarios to define sediment shed • Preliminary model results expected late 2006

  18. Sediment Workgroup Task Timeline Task Timeline General report Vol I: Up to scenario Jan 2006 – Dec 2006 Vol II: Sedimentshed Jan 2007 - 2009 Define Sediment Sheds 2006 - 2007 Delineate Sediment Shed Determine Budgets 2007 - 2009 Support for Scenarios to restore SAV 2008 - 2009 Expanding on compilation of menu of sediment BMP present - 2009 practices and benefits

More Related