1 / 20

JAA JAR-FSTD A Working Group

JAA JAR-FSTD A Working Group. 3rd Meeting 9 th December 2003 Zurich. Terminology. FSTD = Flight Simulation Training Device. JAA STD = Simulation Training Device. FAA FSD = Flight Simulation Device. FSTD-A WG Members. Mark Dransfield UK CAA Peter Barrack UK CAA/FSTD H WG

charla
Télécharger la présentation

JAA JAR-FSTD A Working Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JAA JAR-FSTD A Working Group 3rd Meeting 9th December 2003 Zurich

  2. Terminology FSTD = Flight Simulation Training Device JAA STD = Simulation Training Device FAA FSD = Flight Simulation Device

  3. FSTD-A WG Members • Mark Dransfield UK CAA • Peter Barrack UK CAA/FSTD H WG • Colin Stephens BAFT • Jim Brady IAA • Manfred von Allmen FOCA • Bruno Haller DGAC • Gerry Elloy TTS • Don Irving CJAA • Tony Buckley FSTD H WG Chair

  4. NPA-STD 11 - Objectives • To draft the amendment and associated advising material to the existing JAR-STD(A) family of documents: • Create JAR-FSTD A from JAR-STD 1A, 2A, 3A and 4A • Incorporation of existing Temporary Guidance Leaflets as appropriate • Compliance with JAR-11 regarding the format and structure of JAR documents • Ensure commonality with NPA-10 for the production of JAR-FSTD H

  5. Objectives - 2 • To develop and propose the resulting NPA to the appropriate division of Central JAA • To review the comments following the consultation process of the NPA & generate responses to the comments • To develop and agree the final draft of the proposed JAR-FSTD A

  6. Terms Of Reference Working Group Composition • The WG will comprise members of • JAA STD Advisory Board • JAA National Authorities • Interested Parties • Central JAA • Chairman • Mark Dransfield • Secretary • Gerry Elloy

  7. Terms Of Reference Meetings • STD WG meetings will typically last either one or two working days and occur approximately once every 8 weeks until the JAR-FSTD A is complete. • Frequency of meetings after this point will be determined as necessary. Working Methods and Objectives • By means of meetings and correspondence.

  8. JAR-STD(A) Current Status

  9. JAR-STD(H) Current Status

  10. JAR STD-1A Amendment 3 • NPA-STD 8 Amendment 3 incorporated… • QTG tests and tolerances as per revised ICAO • Updated functional and subjective tests • Criteria for extending STD qualifications • Level C visual requirements same as Level D • Field Of View and Daylight requirements • Publication date – Tuesday 1st July 2003

  11. Other Questions / Food For Thought • Maintain integrity with ICAO version 2 • Avoid changing 1A Amendment 3 for technical reasons compared to ICAO. • Starting point will be JAR-STD1A Amdmt 3 • Commonality with JAR-FSTD H (NPA-STD 10) • Tony Buckley • AMC and IEM replaced by ACJ (JAR 11) • Acceptable Means of Compliance • Interpretative and Explanatory Material • Advisory Circular Joint • TGLs 8 and 3 to be incorporated • TGL 3 Integrated testing (Omitted from Amdt 3) • TGL 8 Applicability of JAR-STD amendments to flight simulator data packages for existing aeroplanes

  12. Timescales & Schedule • Convene JAR-FSTD 1A WG 1ST July 2003 • Draft amended JAR (May 2004) to CJAA • CJAA Review (July 2004) • Consultation (Jul - Dec 2004) • Review of comments (Feb 2005) • Adoption (May 2005) • Publication (Sep 2005) • Implementation (+12 months?)

  13. Work Assignments • Section 1 • Subparts a), b), c) + minimum reqmts – BH • 3A tech requirements to be simplified as per 2A • Check terminology with JB • Simulator Standards – MD/GE/DI • Arrange a 2 day meeting to review the combined version of standards and identify format and areas of commonality, wording etc • Eventually check compatibility back against validation tests (Latency eg) • Review FNPT MCC instrument standards with view to collapsing to a few lines and moving detail to ACJ

  14. Work Assignments • Section 2 • 1A.005 Terminology / Abbreviations – JB • Compare combined version against equivalent sections in JAR-FSTD H • 1A.015 Application etc – JB • Review combined material – requires WG discussion • 1A application letter format ? • 1A.020 Validity – JB • Review combined material – requires WG discussion • 1A.025 Quality System – JB • Review combined material – requires WG discussion • Also depends on MD/BH Quality System review paper as part of AB meeting in March 2004

  15. Work Assignments • Section 2 • 1A.030 Validation Tests – MVA • Combined Validation tests lead in material & table has been produced • Review combined material – requires WG discussion • Suggest all WG members review the proposed validation tests versus the comparison table and forward all comments to MVA/MD by end January. • Following these comments we will agree the date for the review of the next version.

  16. Work Assignments • Section 2 • 1A.030 Section 3 Functional & Subjective Tests – CS • Review combined material – requires WG discussion • Suggest all WG members review the proposed validation tests versus the comparison table and forward all comments to CS/MD by end February. • Following these comments we will agree the date for the review of the next version.

  17. Work Assignments • Section 1 and 2 • 1A.030 to 1A.050 plus associated ACJs – MD/DI • Review compatibility of remaining ACJs/AMCs/IEMs between 1,2,3,4A and combine

  18. Other Actions • Commonality with JAR-FSTD H • Common meeting between WG chairs on structure, possibly 3rd week in February 2004 at Gatwick DI/MD/TB/PB • NPA-11 & 10? • Write and get approved via Agenda for Change – DI/MD

  19. Next Milestones • 15th,16th January 2004 LGW • MD/DI/GE review of FS standards • End January 2004 • Validation test comments received from WG to MVA/MD • End February • F&S test comments received from WG to CS/MD • Meeting between WG chairs on common structure, DI/MD/TB/PB at LGW (1st/2nd week?) • End March 2004 • Quality system update via AB meeting paper • 1A.030 to 1A.045 ACJs – MD/DI • Next WG meeting to follow AB meeting on 16th, 17th March in Madrid to produce first draft of FSTD A?

  20. Next Milestones • End April 2004 • Complete draft document available for WG Review and final WG mtg prior to submittal to CJAA • End May 2004 • Submit draft FSTD A (and H?)to CJAA • CJAA Review July 2004 • Consultation Jul - Dec 2004 • Review of comments Feb 2005 • Adoption May 2005 • Publication Sep 2005 • Implementation +12 months?

More Related