1 / 7

Evaluation of NEW LARGE ENERGY LOADS

Evaluation of NEW LARGE ENERGY LOADS. July 28, 2014 Andy Wendell. Current Situation. Significant increase in requests for energy loads. Requests ranging between 1 and 10 MegaWatts . 30 + independent inquiries for new large load. (5) active applicants

Télécharger la présentation

Evaluation of NEW LARGE ENERGY LOADS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation of NEW LARGE ENERGY LOADS July 28, 2014 Andy Wendell

  2. Current Situation • Significant increase in requests for energy loads. • Requests ranging between 1 and 10 MegaWatts. • 30+ independent inquiries for new large load. • (5) active applicants • Anticipating 5 to 7MW to come on-line in 2014 Characteristics: • Expansion capability is valued. • Service locations are county wide (non-specific) • Targeting available leased space • Load type is “flat” 24/7 2

  3. Mitigation • Engineering fees adjusted to reflect true costs • Implementation of large load application process • Adjustments to application • Utilization of new service deposit language Results: Reduction in “tire kickers” Improved responsiveness to applicants Improved engineering and system planning 3

  4. Potential Mid-Term Impacts • Electrical system capacity • Physical infrastructure • Reliability & redundancy • Revenues • Idle services 4

  5. Revenue Impact Retail versus Wholesale Annual average Distribution system growth is approximately 2 to 3 MW 5

  6. Planned Mitigation • Track and monitor new applications • Rate committee actions • Calibrate Schedule 4 (contract) • Consider aggregation language • Evaluation of system impact charges • Study revenue requirements • Engineering • Evaluation of “net-zero” impact • Evaluate impacts to long range planning model 6

  7. 7

More Related