SlideServe
Menu
Préférences
© SlideServe · v2026

Implementation Workshop of PRIASOFT in Balangir District: Progress and Challenges

chastity-everett avatar
14 diapositives · 271 Views · Nov 20, 2014

This workshop focuses on the implementation of PRIASOFT software in Balangir District, covering the geographical profile, computerization status of Gram Panchayats, and associated infrastructural developments. With a population of 1.37 million spread over 6569 sq. kms, Balangir faces challenges such as limited internet connectivity in non-electrified GP areas and various issues related to data entry in the software. Key topics include the installation of hardware, broadband connectivity progress, and troubleshooting common challenges faced during the deployment phase.

Implementation Workshop of PRIASOFT in Balangir District: Progress and Challenges - slide 1
01 / 14Implementation Workshop of PRIASOFT in Balangir District: Progress and Challenges
1 / 17

Télécharger la présentation

Implementation Workshop of PRIASOFT in Balangir District: Progress and Challenges
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. WORKSHOP ON implementation ofPRIASOFT Presented By: DRDA Balangir

  2. District Profile on Balangir Geographical Area : 6569 Sq Kms Sub Division : 3 Blocks : 14 Urban Bodies : 4 Gram Panchayats : 285 Villages : 1792 Population : 13.37 Lakhs Rural : 11.83 Lakhs Urban : 1.54 Lakhs SC : 2.26 Lakhs ST : 2.76 Lakhs BPL Families : 2.01 Lakhs Cultivable Area : 3.40 Lakh hect Irrigation Potentiality : 0.55 Lakh hect Major Irrigation : 1103 hect Medium Irrigation : 6587 hect Minor Irrigation : 14496 hect Lift Irrigation : 7668 hect Dug Wells : 9240 hect Other Irr. Sources : 15992 hect

  3. STATUS OF GRAM PANCHAYAT COMPUTERIZATION • Order placed to OCAC for hardware purchase of 285 GP of Balangir District. Blocks – 2 desktop with UPS, 2nos. laser printer & MS Office. GPs – 1 desktop with UPS / Laptop, 1 laser printer & MS Office • Out of 285, 60 GPs are non-electrified, so laptop supplied. • All the hardware has been supplied and installed in all the 14 blocks and 285 GPs. • Installation certificate for the GP Computerization from all the 14 BDOs has been given to OCAC vide Letter No. 2818 dated 04/09/2010 with a copy to Govt. in PR vide memo no.2819 dated 04/09/2010. • Order issued to all BDOs for landline telephone connection with broadband facilities. • 5 GPs from Khaprakhol, Gudvella & Puintala has been connected with Broadband internet service and entry of PAMIS 2010 & NREGA are in progress at the GP Point. • Godrej make Chair & Table have been supplied to all GPs.

  4. Status of Gram Panchayat Data Base Facility Centre (20 seated LAN) • Instructions has been given to all BDOs for furnishing of the LAN Room as per requirement. • 5 location like Agalpur, Gudevella, Deogaon, Khaprakhol & Bangomunda have completed the room furnishing & other 9 are in progress. • Order placed for fixing of table, Dais, supply of Chair and the work is likely to be complete by 30th of this month. • Hardware materials supplied to all the blocks and all are in shape custody of the BDOs i.e. • 5 nos. of desktop with UPS • One LCD projector • One Touch Screen TFT Monitor. • Two nos. of Air Conditioner with stabilizer • Networking equipements. All the Blocks will complete the work for 20 seated by 15th October, 2010.

  5. PROBLEM FACED DURING DATA ENTRY (ERRORs & SUGGESTIONs)

  6. Same Password for All the Levels Different Password Should be allotted for different Levels. Because of Same Password insecurity lies in the Software

  7. Schemes not Available Schemes Like Community Dev, ORDP, Education etc schemes are not available in PRIASOFT Own Resource Scheme not Available in GP Level OB Reports

  8. Voucher Number Manual Voucher Numbering is very difficult to maintain Due to inconsistent Numbering of the transactions confusion is created So Voucher numbering should be generated through S/w itself

  9. Difficulties in Voucher Entry: • Entry should be scheme wise but presently it is voucher type wise. • “Session time out”error after 2 to 3 voucher entry. • Multiple cheque issue is not possible in a single voucher. • Modification of entered vouchers are not possible. • Single Voucher entry in PRIASOFT taking much more time then OLD PAMIS & PAMIS-2010.

  10. Problem in Salary payment in 12FCA

  11. Infinite Loop in Modify Post Office A/c Form If, there is no post office a/c available in the logged in user, the problem arises after entering the following form.

  12. Village Data not Available: during work entry

  13. …… Thank You