1 / 14

The Neon Tilers

The Neon Tilers. Rhiannon Day and Larissa McBride. QUESTION 1. Make A Plan For Finding An Area For The Floor To Be Tiled. Include The Geometric Formulas You Will Use To Find The Area. Then Find The Area Of The Floor That Will Be Tiled?. Plan. Find area of whole floor. Find area of cabinets

cher
Télécharger la présentation

The Neon Tilers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Neon Tilers Rhiannon Day and Larissa McBride

  2. QUESTION 1 • Make A Plan For Finding An Area For The Floor To Be Tiled. Include The Geometric Formulas You Will Use To Find The Area. Then Find The Area Of The Floor That Will Be Tiled?

  3. Plan • Find area of whole floor. • Find area of cabinets • Subtract the area of cabinets from the area of the whole floor • Formulas: • a=b*h • a=h(btB) /2

  4. ANSWER 1 (part one) • Calculations • 10*2=20 sq.ft. (rect 1) • 5*2=10 sq. ft.(rect 2) • 2 (4+5) /2= 9 sq. ft. • 20+10+9= 39 sqft Rectangle 1 Rectangle 2 trapezoid

  5. ANSWER 1 (part 2) • Cabinets Area = 39 sqft 13 * 18=234 sq 13 ft Floor Area=234 sqft 234 sqft (entire floor area) 18 ft • 39 sqft(cabinets area) 195 sqft Tiling area= 195 sqft

  6. Question 2 • You estimate that it will take 4 minutes to install each square foot of tile. Find the number of hours it will take you to complete the job.

  7. ANSWER 2 • Each square foot takes 4 minutes • There are 195 sq. ft. • 195 x 4 780 minutes • 780/60= 13 hours • With 195 sq. ft. It will take 780 minutes which is 13 hours.

  8. QUESTION 3 • Determine how much you will charge per hour for labor. Remember that the costs need to be competitive or you will not get any work.

  9. ANSWER 3 • For labor, we will charge $11.00 per hour.

  10. Question 4 • What other costs do you have to consider? Write an expression to represent the cost of your expenses if the customer chooses a tile that costs $t per square foot.

  11. ANSWER 4 • t* 195+ (11*13)

  12. QUESTION 5 • How much will you charge for the owner of the kitchen shown above to install tile that costs $8 per square foot? Prove a detailed explanation that you can share with the customer.

  13. ANSWER 5 • If you choose the tile that costs $8 per square foot, the whole project will cost $1703 because: 195 (sqft) * $8 = 1,560 b 1,560 + $ 153 (our wage) = $1,703. So the cost for your kitchen will be $1, 703.

  14. THANK YOU FOR WATCHING OUR PRESENTATION! 

More Related