Construction of the IREN source Status&perspectives

Construction of the IREN source Status&perspectives. Status of the project in current year During months after the 19 th PAC NP session main efforts were done on preparation for IBR-30 dismantling, installation of new linac and

cira
Télécharger la présentation

Construction of the IREN source Status&perspectives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction of the IREN source Status&perspectives Status of the project in current year During months after the 19th PAC NP session main efforts were done on preparation for IBR-30 dismantling, installation of new linac and organization of transportation of IREN fuel elements from “MAYAK” plant and its storing at JINR. IBR-30 dismantling • It was delivered a shadow shielding for new storage bld. 117/6 • The set of documents necessary for licensing of the storage in Russian Agency for Radiation Safety is practically completed • But up to now it has not paid the dosimetric equipment necessary for commissioning of bld. 117/6. It can cause a derangement of full IBR-30dismantling by the end of current Linac installation • Very recently, on 11-12 March it was achieved practically planned parameters of the pulsed linac electron gun • By the end of April it was completed an assembling of linac grid with geodesic accuracy IREN fuel transportation • Transportation of the IREN fuel load is possible now only in autumn PAC NP April 2004

  2. Construction of the IREN source Assembling of linac Linac grid Pulsed electron gun PAC NP April 2004

  3. Construction of the IREN source Status&perspectives • But it is crucial for future of whole project an approval by JINR directorate of the realistic time-table with respective firm annual financing. • The last point depends essentially from finding of new sources for support of the IREN project • A detailed consideration of the most optimistic time-table presented at NP PAC session shows that even in the case of optimal financing a start-up of IREN source may be realized not earlier than by the end of 2006 PAC NP April 2004