Team Hot Stamp. A Data Based Continuous Improvement Model System. Perry Goss, Team Leader Alan Stolzer Greg Arbuckle Duane Floyd Errol Samuel. Objectives / Scope. Objective of Project To reduce the Hot Stamp DPM rating by 50% Scope of Project

cleave
Télécharger la présentation

Team Hot Stamp

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team Hot Stamp A Data Based Continuous Improvement Model System Perry Goss, Team Leader Alan Stolzer Greg Arbuckle Duane Floyd Errol Samuel

  2. Objectives / Scope Objective of Project To reduce the Hot Stamp DPM rating by 50% Scope of Project Start with CF-29 project and expand to all other products.

  3. Data Based Process

  4. Establish Control

  5. Pareto of Defects

  6. Capability Studies CF-29 Opening Force Capability Cp = 1.13 CpK = 0.94 CF-29 Swing Torque Cp = 0.92 CpK = 0.60

  7. Attribute Capability RatingOverallCF-29 YTD H/S DPM 12,497 136,646 Feb. H/S DPM N/A 204,687 3/4 H/S DPM 4,029 35,991

  8. Measurement System Study - Attributes Measurement System Study - Attributes Trial One Screen % Effectiveness Score - 76.67% Screen % Effectiveness Score vs. Attribute - 76.67%

  9. Measurement System Study - Attributes, After Training Measurement System Study - Attributes Trial Two Screen % Effectiveness Score - 93.33% Screen % Effectiveness Score vs. Attribute - 93.33%

  10. Block Flow Diagram of Process

  11. Improvement Processes The next series of slides show the improvement processes that were undertaken. The results will be shown after these slides.

  12. Multi-Vari

  13. Multi-Vari

  14. Multi-Vari

  15. Multi-Vari

  16. Multi-Vari

  17. Multi-Vari

  18. Multi-Vari

  19. Bivariate Histogram

  20. DOE

  21. DOE

  22. Suggested Improvements • Reduce the Mold Cleaning Interval • Change the Base Resin

  23. Implemented Improvements • Reduce the Mold Cleaning Interval • Change the Material

  24. Team Hot Stamp

  25. Improvements / Results

  26. Future Improvements • Expand research to include other hot stamp defect causes. • Expand work to include variables data not improved.