260 likes | 356 Vues
Team Hot Stamp. A Data Based Continuous Improvement Model System. Perry Goss, Team Leader Alan Stolzer Greg Arbuckle Duane Floyd Errol Samuel. Objectives / Scope. Objective of Project To reduce the Hot Stamp DPM rating by 50% Scope of Project
E N D
Team Hot Stamp A Data Based Continuous Improvement Model System Perry Goss, Team Leader Alan Stolzer Greg Arbuckle Duane Floyd Errol Samuel
Objectives / Scope Objective of Project To reduce the Hot Stamp DPM rating by 50% Scope of Project Start with CF-29 project and expand to all other products.
Capability Studies CF-29 Opening Force Capability Cp = 1.13 CpK = 0.94 CF-29 Swing Torque Cp = 0.92 CpK = 0.60
Attribute Capability RatingOverallCF-29 YTD H/S DPM 12,497 136,646 Feb. H/S DPM N/A 204,687 3/4 H/S DPM 4,029 35,991
Measurement System Study - Attributes Measurement System Study - Attributes Trial One Screen % Effectiveness Score - 76.67% Screen % Effectiveness Score vs. Attribute - 76.67%
Measurement System Study - Attributes, After Training Measurement System Study - Attributes Trial Two Screen % Effectiveness Score - 93.33% Screen % Effectiveness Score vs. Attribute - 93.33%
Improvement Processes The next series of slides show the improvement processes that were undertaken. The results will be shown after these slides.
Suggested Improvements • Reduce the Mold Cleaning Interval • Change the Base Resin
Implemented Improvements • Reduce the Mold Cleaning Interval • Change the Material
Future Improvements • Expand research to include other hot stamp defect causes. • Expand work to include variables data not improved.