1 / 7

Bridge Construction Project

Bridge Construction Project. By: Alexis Shaw. Background of the first bridges going across the seven River.

clodia
Télécharger la présentation

Bridge Construction Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bridge Construction Project By: Alexis Shaw

  2. Background of the first bridges going across the seven River • The Severn has two bridges that cross it. One is called Severn River Bridge that was built first in 1886. The other bridge is called US Naval Academy Bridge because it ends near the academy. the latter bridge was built as a drawbridge in the late 1920s.

  3. Reason why to make a new bridge • The ecological survey will be constructed to justify a potential construction site for a new bridge on the Severn River to have less traffic and congestions. The Severn River bridges are causing more problems with bad traffic.

  4. Background: Ecosystem • The river runs for over of 81 square miles (210 km2), or 69 square miles (180 km2) of land and the water that is input into the river is freshwater from Severn run. But there are bad problems with the river and there been overfishing population.

  5. New Location

  6. Sources • http://www.mdot.maryland.gov/News/2009/August%202009/Oyster%20Award.pdf • http://www.dnr.state.md.us/fisheries/fhep/?p=Severn • http://en.wikipedia.org/wiki/Severn_River_(Maryland)

More Related