1 / 25

30 th November 2012

Ashton Coal Operations Pty Limited. Community Consultative Committee Environmental Report. 30 th November 2012. Ashton Monitoring Locations. Depositional Dust. Monitoring. Total Suspended Dust. Monitoring. PM 10 Dust – Site 1. Monitoring. Maximum daily limit 50 µg/m 3.

coby
Télécharger la présentation

30 th November 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport 30th November 2012

  2. Ashton Monitoring Locations

  3. Depositional Dust Monitoring

  4. Total Suspended Dust Monitoring

  5. PM10 Dust – Site 1 Monitoring Maximum daily limit 50µg/m3

  6. PM10 Dust – Site 2 Monitoring Maximum daily limit 50µg/m3

  7. PM10 Dust – Site 3 Monitoring Maximum daily limit 50µg/m3

  8. PM10 Dust – Site 8 Monitoring Maximum daily limit 50µg/m3

  9. Rainfall Monitoring

  10. Water Sampling Locations Monitoring

  11. Water Quality - pH Monitoring

  12. Water Quality - pH Monitoring

  13. Water Quality - pH

  14. Water Quality - EC Monitoring

  15. Water Quality - EC Monitoring

  16. Water Quality - EC Monitoring

  17. Groundwater Sampling Sites Monitoring

  18. Groundwater – Standing Depth Monitoring

  19. Groundwater – Standing Depth Monitoring

  20. Groundwater – EC Monitoring

  21. Groundwater – EC

  22. Noise Monitoring Statutory noise monitoring was conducted in November 2012. There were no exceedences for the reporting period. Noise

  23. Complaints There were no complaints or enquiries received during this quarter. Total complaints Direct: 0 – Indirect: 0, Total enquiries: 0 Community

  24. Management Plan Reviews

  25. Any Questions?

More Related