1 / 10

STUDY KASUS : JWD (Job Well Done) CONSULTING

STUDY KASUS : JWD (Job Well Done) CONSULTING. Kelompok Super MPTI. Yunan Kurbiawan Adhi 113070227 Teguh Jati Nugraha 113070284 Muhammad Nurrahman 113070306 Indra Lukmana Sardi 113070330 Eva Nurhazizah 113071010 Rizki Kusuma Wardhani 113071006 Evan Varian 113071099. Erica Team.

cody
Télécharger la présentation

STUDY KASUS : JWD (Job Well Done) CONSULTING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STUDY KASUS :JWD (Job Well Done) CONSULTING

  2. Kelompok Super MPTI YunanKurbiawanAdhi 113070227 TeguhJatiNugraha 113070284 Muhammad Nurrahman 113070306 IndraLukmanaSardi 113070330 Eva Nurhazizah 113071010 RizkiKusumaWardhani 113071006 Evan Varian 113071099

  3. Erica Team Organisasi consulting kelasdunia Joe Fleming CEO JWD Consulting STUDY KASUS Client Client Erica Bell Project Management Office Konsultan Konsultan Konsultan Konsultan Client

  4. Project Initiation Project Planning Project Executing Group Process Project Monitoring and Controlling Project Closing

  5. Project Initiation • Project manager assigned • Key stakeholder identified ? • Project charter completed and signed • Business case completed

  6. Project Planning • A project scope statement • A team contract • A work breakdown structure(WBA) • A list of prioritized risk • A project schedule

  7. Project Executing • Survey completed • Intranet site construction completed • Links completed • Intranet site design completed • User request feature completed • Intranet site testing completed • Project benefit measurement completed • Ask the expert completed • Intranet site promotion completed • User input collected • Articles completed • Templates and tools completed • Intranet site roll-out completed

  8. Project Monitoring and Controlling • Status subproject • & • Progress report

  9. Project Closing • Lessons-learned report • Final project report table of contents

  10. TerimaKasih