An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Devizes RFC Floodlights and Grounds Improvement Project Summer 2013 Updated June 2013

  2. Contents • Pictures to demonstrate our plans • Permanent Floodlights • Car Park Upgrade • General Pitch Maintenance • Pitch-side Drainage and Walkway • Pitch-side Safety Fencing • Pitch-side Dug Outs • Enhanced Spectator Viewing Facilities • Upgrade Training Area Lights

  3. Permanent Floodlights – Top Pitch Work completed, 100% success

  4. Car Park Improvements Nearly complete, resurfacing is done, lights and edges to be completed shortly

  5. General Pitch Maintenance We will Shockwave Aerate, de-compact, re-seed, weed supress and Hollow Bore treat our 2 pitches and training area. Re-surface top of training area. In progress.

  6. Pitch-side Drainage and Walkway In progress

  7. Pitch-side Safety Fencing In progress

  8. Pitch-side Dug Outs Two Dug-Outs on hard standing concrete to be installed on the far touchline. About to start, plans updated, now one dug out either side of the pitch.

  9. Enhanced Spectator Viewing Facilities In progress

  10. Upgrade Training Area Lights Work in progress, completed in the next 2 weeks

  11. Summary – DRFC Lights and Grounds Improvement Plan Wiltshire Police HQ Complete In Progress About to Start Cricket Pitch New Flood Lights Tennis Courts Additionally We will be replacing the existing score board and having a second board on the far touch line Club House Upgrade Existing Training Lights New Fence Spectator Area Walkway 2 Dug Outs Existing Fence Resurface existing Car Park New Car Park