Display a message on a wheel of bike while it roll. Project review. Corentin Marzin | Alexis Buon | François Lenin. Sommaire. The project in a few words Presentations of the specifications Presentation of Gantt diagram Presentation of my part Conclusion.
Project review
E N D
Presentation Transcript
Display a message on a wheel of bike whileit roll Project review Corentin Marzin | Alexis Buon | François Lenin
Sommaire • The project in a few words • Presentations of the specifications • Presentation of Gantt diagram • Presentation of my part • Conclusion
The project in a few words Programmation Conception Montage
Specifications • Technical confines : • The letter must belegible in a matrice LED 5x7. • Differentsmaterialused must be light and resistant. • The batterywillbe rechargeable. • The system must be light and not bulky. • Physical confines : • The message must belegible in a shade of forest. • Standard size for the wheel(26pouces). • 41 letter maximum on the wheel. • Economical confines: • 100€ maximum for the differents prototype. • Humansconfines : • The system musn’tharrm to the humanenginneering of a bike. • Le texte affiché devra être fluide et tenir compte de la persistance rétinienne.
Gantt diagram Reality Estimated
Choice of the components LED Complementarymaterials Support Pic Microship