cybele
Uploaded by
20 SLIDES
344 VUES
200LIKES

A MR Compatible Pressure Transducer with Data Acquisition Software Program

DESCRIPTION

A MR Compatible Pressure Transducer with Data Acquisition Software Program. Mark Crowe Viral Patel Advisor: Dr. David Pickens. Project Purpose.

1 / 20

Télécharger la présentation

A MR Compatible Pressure Transducer with Data Acquisition Software Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A MR Compatible Pressure Transducer with Data Acquisition Software Program Mark Crowe Viral Patel Advisor: Dr. David Pickens

  2. Project Purpose • The goal of this project is to design and build a pressure transducer to measure vasodilation patterns in males with hypersexuality disorder that can function in a MR environment and also create a software program for data acquisition and storage.

  3. Hypersexuality: seen as an out of control pattern of sexual thinking and acting, driven by anxiety reduction rather than desire, as a disorder similar to chemical addiction and closely related to obsessive-compulsiveness, and as a attributable to early childhood abuse and/or neglect.

  4. Project Background • Joint study between Department of Psychiatry and Department of Radiology. • fMRI used to determine whether similar brain regions are activated by visual, sexual, and drug-related stimuli. • This study can lead to scientific information concerning the cause and effect of pathological hypersexuality.

  5. fMRI • fMRI is a technique for determining the region of the brain activated due to physical sensation or activity. • Based on increased blood flow • The active brain regions of these patients will be compared sexual arousal activation maps in normal males.

  6. Market Potential • This is a built-to-suit device and will only be used for research purposes. • No opportunity for individual consumer sales. • An effort could be made to contact the largest research sites for fMRI around the country. • Possible use for testing impotence • Requires input from urologists

  7. Budget • Vanderbilt’s Department of Psychiatry provided: • $200 pressure transducer • $50 sphygmomanometer • Vanderbilt’s Department of Radiology provided: • Computer with DaisyLab installed • Oscilloscope • Plastic tubing • Any unforeseen costs will be covered by the Psychiatry Dept. • Once project is shown to function properly, a new computer system will be bought solely for the use of this study.

  8. Experiment Structure Stimulus (Video) Subject watches video while in MR magnet Projected onto Screen Vasodilation occurs Change of pressure in cuff

  9. Project Schematic Cuff Pressure Transducer Computer Amplifier Data Acquisition Card

  10. Calibration of Tranducer Change of 0.336 V for every 20 mm Hg increase

  11. Project Description • The pressure transducer is connected to the cuff and to the gauge of a sphygmomanometer.

  12. Project Description • Pressure measurement from transducer is sent to an amplifier with a coaxial output for the signal. • Signal sent to computer via data acquisition chip.

  13. Project Description • Pressure measurement from transducer is sent to an amplifier with a coaxial output for the signal. • Signal sent to computer via data acquisition chip. • DaisyLab program created to acquire and store measurements.

  14. Project Description • Pressure measurement from transducer is sent to an amplifier with a coaxial output for the signal. • Signal sent to computer via data acquisition chip. • DaisyLab program created to acquire and store measurements. • Data acquired in real-time.

  15. Project Description • Pressure measurement from transducer is sent to an amplifier with a coaxial output for the signal. • Signal sent to computer via data acquisition chip. • DaisyLab program created to acquire and store measurements. • Data acquired in real-time. • Measurements and time of occurrence stored in a text file for later analysis with Microsoft Excel.

  16. The MR environment • Effect of magnetic field on signal? • Will tubing cause problems with SNR?

  17. Project Status • Pressure transducer has been assembled and calibrated. • A software program has been created with DaisyLab for data acquisition. • Balloon Testing is complete.

  18. Project Status • Device tested on patient outside of MR environment • Device tested on patient in MR environment

  19. Current/Future Work • Modifying software program so that ECG data can also be recorded. • Complete by March 15 • Construction of a container for the device components. • Complete by March 15 • Write program for new computer