60 likes | 178 Vues
The current status report indicates that all critical components have been prepared for installation. The PCB, drift plane, and RO cables are ready for use. Specifically, all RO cables and facilities, including PAD and HV drift connections, have been successfully installed. The resistances prepared include 5 Mohm, 3 Mohm, 1 Mohm, and 100 kohm options, ensuring robust connectivity. With these components set, we are now poised to proceed with the next phases of the project.
E N D
The box is ready • Drift plane is ready • PCB is ready • RO cables are ready Everything has been installed
RO cables PAD HV DRIFT DRIFT HV RO cables
5 Mohm 5 Mohm 3 Mohm 3 Mohm 1 Mohm 1 Mohm 100 kohm 100 kohm 300 um 200 um