An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Daily operation report Jan.18-19, 2003 Physics group II and operation group II

  2. Outline 1, 24-hour Review 2, Plasmas 3, Systems 4, New Information

  3. 09:30-10:00 10:00 Quench (loss of superconducting state) 12:00 start increasing It 13:40 start plasma testing (It~2000A) 55166 15:00-16:00 water overflow 16:00-21:00 discharge with LHW+IBW(30MHz) 21:00-23:00 synchronous signal horizontal displacement feedback vertical displacement feedback 23:00-04:00 LHCD (since 55238) 04:30-now IBW solo (30MHz)

  4. Quench Max Pouter~1.7E-1 Pa (Commonly ~5E-4 Pa, Palarm is set to 4E-3 Pa) Possible reason

  5. LHCD shots Good Current Drive efficiency at Ip~110kA ne~0.9E19m-3(55264) ~0.5E19m-3(55262) Reference shot: 53808 IPA PLHI DEF VF VPI NE3

  6. At ~110 kW, good particle confinement observed, though no obvious Te increase is observed. Ip~130 kA, ne3~1.3E19m-3. 30MHz IBW shot IPA ICH! NE3 HA1 HA18 HA35

  7. Typical shots LHCD: 55262, 55264 IBW: 54821, 54822, 54844

  8. System • Vacuum system, Inter-shot pressure was ~2.0e-5 Pa. • Water supply, sensor broken • LHW, switches broken • IBW, Maximum power~120 kW

  9. ‘垂直位移反馈控制系统的有关说明’available (相应的处理?) Amplitude of different m value MHD New Information

  10. New Information IPA Z1 MAT0 m=2 m=3 m=4 m=5

  11. Problems 1, Vertical displacement feed-back control abnormal. More than 8 times. Potential threat against long pulses. Problem: Startup relay skip. Solution: At ~04:00, short-circuit the relay. (after 55266) IPA PLVB SB1 PLHI

  12. Abnormal ECE arrays 140eV@-13.9cm 228eV@-15.8cm 23eV@-17.6cm -30eV@-19.4cm 38eV@-21.1cm -14eV@-22.1cm -72eV@-24.3cm 7eV@-25.9cm

  13. 注意! 当放电长时间暂停后,恢复放电前,应检查到平台上下角角落落,确保没有遗漏任何人员在放电现场,方可继续放电. 建议: 钥匙分组. 平台下安装报警灯.