1 / 9

Daily Operation Report Operation Team I

Daily Operation Report Operation Team I. X. Gong , Z. Zheng, H. Wang, C. Hu, C. Xie , A.Ti. Dec 17-18, 2005. Experimental Topic: AC Operation RF-Boronization Recycling and fuelling efficiency High performance long pulse discharges with LHCD &IBW Shot No.# 83356 ~# 835xx

ady
Télécharger la présentation

Daily Operation Report Operation Team I

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Daily Operation Report Operation Team I X. Gong, Z. Zheng, H. Wang, C. Hu, C. Xie, A.Ti Dec 17-18, 2005

  2. Experimental Topic: • AC Operation • RF-Boronization • Recycling and fuelling efficiency • High performance long pulse discharges with LHCD &IBW • Shot No.#83356~#835xx • It: ~4200A, IP: 100-200KA, ne:0.5~6.0, LHCD: 100-250KW

  3. New AC Operation Mode by Actively Control Def

  4. Explore AC Operation Conditions (I)

  5. Explore AC Operation Conditions (II)

  6. The 3rd RF-Boronization Uncontrollable density ->density limiter disruption Controllable density, but still with high hydrogen recycling

  7. Estimate of recycling coefficient after 3rd Bnz

  8. Fuelling efficiency after Bnz

  9. Search for better plasma parameter for full no-inductive current drive suitable for high performance long pulse discharges

More Related