An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New • Contractor Performance • Evaluation

  2. Subcommittee Team • ODOT • PM Offices: Ron Snell and Shane Ottosen • Traffic Roadway: Bob Pappe • Construction Section: Lori Butler and Barbara Harriman • Office of Procurement: Wynnette Gentemann • Industry • Hamilton Construction PM: Brad Sullivan • Wildish PM: Tom Deines • PM: Jim Jackson • DOJ • General Council, Business Transactions: Ethan Hasenstein

  3. ODOT/AGC Recommendation • Create a more accurate scoring system that is representative of performance. • Broaden rating categories and weigh scoring based on importance and risk • Eliminate the rolling average • Improve performance through communication with contractors and corrective action plan. • Develop progressively tiered consequences for poor performance.

  4. Contractor Performance Evaluation Process • Prequalification for Bidding Highway and Bridge Construction / Contractor Performance Evaluations OAR 734-010-0290 • http://www.oregon.gov/ODOT/CS/RULES/Pages/hd_actions.aspx

  5. Contractor Performance Evaluation Form

  6. Contractor Performance Evaluation Form • Everybody starts with an average score and goes up or down based on performance • Average score equals zero • 5 categories will be evaluated individually and cumulatively • Management • Safety • Administration • Regulations • Workforce and Small Business Equity Program

  7. Contractor Performance Evaluation Form – Continued • Performance Level Actions are based on number of occurrences. • Testing of evaluation form and scoring was completed by Project Managers June 2012 • Feedback was collected from Industry representatives Spring of 2012

  8. Scoring Matrix • The Project Manager will score each of the 5 evaluation categories as well as total score. The scores will then fall into one of 3 performance levels. • There is an additional text box that offers room for additional information not represented in the evaluation that can increase or decrease contractor score. • Scores remain active for three years.

  9. Performance Level 1 (PL1)Minimum score allowed by category (Acceptable Level – no action required)

  10. Performance Level 2 (PL2)Minimum score allowed by category

  11. PL2 Action Plan

  12. Performance Level 3 (PL3)Minimum score allowed by category

  13. PL3 Action Plan

  14. Evaluation Score Appeal Process

  15. Suspension of Prequalification • Contractor may go through the DAS Appeal Process to refute a suspension of prequalification. • OAR 734-010-0380 DAS Appeal Process Covering Contractor Evaluations. • http://www.oregon.gov/ODOT/CS/RULES/Pages/hd_actions.aspx

  16. Next Steps • Implement revised Contractor Performance Evaluation Process for all projects going to bid January 2013. • The subcommittee will reconvene January 2014 to evaluate if the improved process is working and whether adjustments need to be made.

  17. Evaluation Form Process • Annual Reviews done on the anniversary of the Notice to Proceed. • Final Reviews done within 60 days of 2nd Note. • Construction Section will send out reminder emails with correct form attached. • Contractors Feedback form only needs to be sent to Contractor when final evaluation is completed. • Only wait 15 days for Contractor’s response.

  18. Resources • If you have additional questions or feedback, please contact: • ODOT: Lori Butler lorraine.e.butler@odot.state.or.us • Industry: Tom Deines tomd@wildish.com • ftp://ftp.odot.state.or.us/techserv/construction/Construction%20Forms/2884_Instructions.pdf

  19. Q & A