An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Utilising State of the Art Technology Presented by: Bradley Roberts

  2. Overview Machine Guidance Tullaroop Dam TX8 Scanner Tullaroop Dam Cairn Curran Outlet Tunnel Greens Lake Pump Station As Constructed Survey – Stuart Murray Canal Gunbower Tree Locations Sensefly albris As Constructed Channel Surveys

  3. Machine Guidance Tullaroop Dam Safety Upgrade

  4. Tullaroop Dam Water Supply to Maryborough and Irrigation Water to Local District Earth Fill Dam Embankment 43m High and 427m Long Originally Constructed 1958-59 Safety Upgrade Works Commenced October 2015

  5. Tullaroop Dam – GPS Guidance GPS Guidance Reduced the need for a surveyor to be permanently onsite. Works were carried out quicker with less downtime. Ability to modify designs from the office. Live progress reports using Visionlink.

  6. Tullaroop Dam – Business Centre

  7. Example – Design Changes

  8. Tullaroop Dam - Visionlink Live data uploaded from machines Export 3D models Create cross sections Volumes Cut/Fill maps

  9. Tullaroop – Scanner Demonstration

  10. Tullaroop Dam – Scanning DTM

  11. Tullaroop - Completed Completed May 2016 Ahead of Schedule Under Budget

  12. Trimble TX8 Scanner Cairn Curran Outlet Tunnel Pump Stations As Constructed Survey – Stuart Murray Canal Capture of Trees in Gunbower Forest

  13. Trimble TX8 Scanner Scanning Speed – 1 million pts/sec Maximum Range – 340 m Minimum Range – 0.6 m Range Noise – <2 mm Standard Mode <1 mm High Precision

  14. Cairn Curran Outlet Tunnel

  15. Cairn Curran Outlet Tunnel

  16. Cairn Curran Outlet Tunnel

  17. Greens Lake Pump Station 5 Hours Survey 15 Stations Approx. 1.4 Billion points Approx. 4gb of Data

  18. Greens Lake Pump Station - Internal

  19. Greens Lake - Pump Replacement

  20. As Constructed Survey – Stuart Murray

  21. As Constructed Survey - Deliverable Horizontal Slice Though Data Exported to AutoCAD Levels & Dimensions from Realworks

  22. Gunbower Forest Tree Survey Gunbower Forest Environmental Works for North Central Catchment Management Authority Required – Number of Trees Tree Type Size

  23. Gunbower Forest Tree Sizes Measured using Trimble Realworks Viewer Viewer can be run from internet explorer

  24. Gunbower Forest Tree Locations Horizontal slice cut through trees 1.5 m above ground level. Can be used to produce a plan showing tree locations.

  25. Sensefly albris As Constructed Channel Surveys

  26. Sensefly albris 38 MP Still Images HD Video Thermal Images/Videos Additional Navcams Ultrasonic Sensors Autonomous Flight Manual Flight

  27. As Constructed Channel Surveys

  28. As Constructed Channel Surveys

  29. Thank You for Listening Presented by: Bradley Roberts