An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBL CO2 coolingVacuum control system development status30.05.2013 Lukasz Zwalinski Thomas Eisel

  2. Overview Presentation overview P&ID status Control system architecture overview Logic/start up sequence and interlocks definitions Components purchasing progres Rack layout proposal Still to do Lukasz Zwalinski IBL 30th May 2013

  3. P&ID Completed Conforming with vacuum systems in ATLAS Lukasz Zwalinski IBL 30th May 2013

  4. Control system architecture Detector Control System OWS OWS OWS DIP EN/CV Terminal server Critical data tunnel from PLC to DCS CERN GPN Central Control Room CERN Technical Network Vacuum PLC M340M CPU Lukasz Zwalinski IBL 30th May 2013

  5. Logic • Logic/start up sequence and interlocks definitions is completed Lukasz Zwalinski IBL 30th May 2013

  6. Components purchasing status Most of the PLC components comes from ATLAS spare Additional PLC components already ordered Vacuum gauges and their red-out system ordered and mostly delivered Electro valves + manual valve ordered PR conditioners for safety actions ordered Diffusion pumps ordered Primary pumps ordered and delivered Thermal switches for diffusion pumps ordered and delivered Lukasz Zwalinski IBL 30th May 2013

  7. Rack layout proposal USA USX Seen from Geneva side Control racks new position! Moved by 800mm New rack! H1600 W800 D800 B A CO2 unit B300 Chiller unit A200 Vacuum control Control rack A&B Accumulator unit A&B Chiller unit B400 CO2 unit A100 Side view FESTO FESTO Compressed air blocks (supply modules and electro pneumatic valves) Cable tray Lukasz Zwalinski IBL 30th May 2013

  8. Still to do Write functional analysis Complete electrical schematics Choose 24V DC power supply Define/buy pull signal and power cables (we are in contact with Sergey and LHC vacuum group) Do 3D CATIA design of control cabinet Design local interconnection boxes in UX15 Find a help to assemble control rack Lukasz Zwalinski IBL 30th May 2013