1 / 3

Levelling Staff

Levelling Staff. Check bottom of staff for wear and cleanliness Hold staff Vertical Use spirit level attachment if necessary OR line up edge of staff with edge of a building For more accurate work “rock” staff towards and away from Instrument

denver
Télécharger la présentation

Levelling Staff

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Levelling Staff • Check bottom of staff for wear and cleanliness • Hold staff Vertical • Use spirit level attachment if necessary • OR line up edge of staff with edge of a building • For more accurate work “rock” staff towards and away from Instrument • Be aware of hitting live overhead cables with aluminium staff

  2. Reading Staff • Alternate colours BLACK / RED every 1metre • Leg of E and small blocks are 10mm i.e. 0.010m • Learn to estimate to nearest 2mm i.e.0.002 • If extension used, check catch fully engaged • Use peg, foot plate or other easily retraced point for change points and mark its position with a temp. marker.

  3. Reading Staff For close up work numbers may not be visible – ask assistant to place pencil on staff and move it up/down until it is visible then look at staff with naked eye.

More Related