This document outlines the agenda for the VVSA project review held on January 19, 2005. The meeting focused on the evaluation of forming die designs, fabrication fixture designs, and vessel geometry. Attendees included members from PPPL and MTM, who engaged in technical discussions, reviewed project schedules, and analyzed manufacturing routing structures. The agenda segments included an introduction, shop tour, and an extensive technical discussion on tolerance control, process outlines, and potential modifications. The review aimed to resolve differences and determine the path forward for project components.
E N D
NCSX VVSA PROJECT REVIEW 19Jan2005 MTM Agenda Forming Die designs Primary Fabrication Fixture design Vessel Geometry evaluation / revised segmentation scheme
Attendees: PPPL: MTM: Mike Cole Kevin Bowling Paul Goranson Jim Flanagan Phil Heitzenroeder Joel Manship Frank Malinowski Mike Manuel Hutch Neilson Doug McCorkle Brad Nelson Gregory Pitonak Larry Sutton Mike Viola David Williamson
Agenda – Segment # 1 7AM – 8AM - Introduction / general overview • Review Project Schedule MTM Gantt Chart • Review Forming Die designs PowerPoint presentation • Review Fabrication Fixture design PowerPoint presentation • Vessel Geometry evaluation PowerPoint presentation • Review Manufacturing Routing structure Live examples
Agenda – Segment # 2 8AM – 9AM - Shop tour 9AM – 11:30AM – Technical discussion • Tolerance / profile, distortion control activities • Process Outline submittal / approval formats • PVVS successes / failures / lessons learned • Previous VVSA formats / development effort • Latest modifications to PS documents (now include specific reference to Product Specification requirements) • Review Current outline format • Resolve differences and determine path forward • Fiducials • Field Joint Spacer geometry
Agenda – Segment # 3 • 11:30 – 12:00 Lunch (brought in) • 12:00PM – 5:00PM - Continue technical discussion outlined above.