1 / 12

Czech-Slovak Corridor

Czech-Slovak Corridor Corridor One-Stop Shop (C-OSS), pre-arranged paths (PaPs) and reserve capacity. Miroslav ZUBER, ŽSR. PCS NG Training – 8. + 9.2.2017, Budapest. Corridor One-Stop Shop (C-OSS) Represented C-OSS provided by IM's employees

dgunter
Télécharger la présentation

Czech-Slovak Corridor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Czech-Slovak Corridor Corridor One-Stop Shop (C-OSS), pre-arranged paths (PaPs) and reserve capacity Miroslav ZUBER, ŽSR PCS NG Training – 8. + 9.2.2017, Budapest

  2. Corridor One-Stop Shop (C-OSS) • Represented C-OSS provided by IM's employees • The C-OSS office is changing every year between SŽDC and ŽSR on rotating principle at the term of timetable change(2016 – SŽDC, 2017 – ŽSR, 2018 – SŽDC, 2019 – ŽSR) • C-OSS languages: Czech / Slovak, English • C-OSS rules approved in November 2013 • New Book 4 ispublishedfor TT 2018 (Englishversion , harmonizedwithotherRFCs)

  3. Tasks of the C-OSS • Give information regarding access to the Corridor infrastructure • Give information regarding procedures for the allocation ofdedicated capacity on the Corridor • Allocate the Corridor pre-arranged paths (PaPs) andthereserve capacity and communicate with the IM oftheCorridor regarding the allocation • Shall be able to provide information regarding traffic management procedures on the Corridor • Shall be able to provide information regarding traffic management procedures in the event of disturbances

  4. RulesforCapacityallocation • General information • PaPs accessible via PCS only • Fixed TT on border crossing sections • Flex approach used on national sections • Path request must cross the border on a RFC corridor (possibly in F/O) • Non RU Applicant must sign agreement with C-OSS(details on website of RFC 9) • All details described in CID Book 4

  5. Rules for Capacity allocation • Reserve Capacity 2017: • Deadline for path request is set to 30 days before train run • Final TT delivered 10 days before train run at latest. • PaP offer 2018: • Deadline for path requests at X-11 on 10.4.2017 • Draft Offer at X-5 • Applicant observations from X-5 till X-4 • Final Offer at X-4

  6. Pre-arranged Paths – Timetable 2018 – W-E (1)

  7. Pre-arranged Paths – Timetable 2018 – W-E (2)

  8. Pre-arranged Paths – Timetable 2018 – E-W (1)

  9. Pre-arranged Paths – Timetable 2018 – E-W (2)

  10. Pre-arranged Paths – Timetable 2018 – E-W (3)

  11. Thank you for your attention! RFC 9 C-OSS Správa železniční dopravní cesty, s.o. Křižíkova 552/2, 186 00 Praha 8, Czech Republic Phone: + 420 972 244 556 (head of office) + 420 972 244 606 Železnice Slovenskej republiky Klemensova 8, 813 61 Bratislava Slovak Republic Phone: + 421 2 2029 3024 +4212 2029 3025 E-mail: oss@rfc9.eu Web: www.rfc9.eu, www.cscorridor.eu, www.cskoridor.eu, www.rfc-czech-slovak.eu

More Related