1 / 48

Review meeting with BGREI states

26 th JULY, 2012. Review meeting with BGREI states. Department of Agriculture & Cane Development Government of Jharkhand. JHARKHAND STATE PROFILE. Area in % Area in Lakhs Ha * Total Geographical Area : 79.71 * Total Cultivable Land : 38.00

diata
Télécharger la présentation

Review meeting with BGREI states

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 26th JULY, 2012 Review meeting with BGREI states Department of Agriculture & Cane Development Government of Jharkhand

  2. JHARKHAND STATE PROFILE Area in % Area in Lakhs Ha * Total Geographical Area : 79.71 * Total Cultivable Land : 38.00 * Net Sown Area : 28.08% 23.62 * Current Fallow : 11.12% 8.87 * Other Fallow : 08.46% 6.75 * Forest : 29.20% 23.28 * Barren Lands : 7.20% 5.74 * Non – Agricultural Use : 8.60% 6.86 * Pasture and Other Grazing Land : 2.48% 1.97 * Cultivable Waste Land : 3.44% 2.74 * Irrigated land : 12.73% 3.007 * Cropping Intensity : 116%

  3. FINANCIAL PROGRESS UNDER BGREI Rs. In Crore Note: 167.62 lakhs of 2010-11 has been re-validated during 2011-12 and has been utilized under the Site Specific Works (BPCD, LBCD & LI). Rs. 0.96 Crore during 2011-12 has been re-validated and utilized under BPCD Programme

  4. PROGRESS Report of BGREI (2011-12)

  5. INTERVENTION WISE PHYSICAL & FINANCIAL Achievement (2011-12 ) Rs. In Lakhs

  6. Rs. In Lakhs INTERVENTION WISE PHYSICAL & FINANCIAL Achievement (2011-12 )

  7. Comparative Yield under Block Demonstration in comparison to rice in farmers field in 2011-12

  8. Note: Includes 341 BPCD during 2009-10 under RKVY.

  9. Panchayat – Bundu, Block- Petarbar, Dist- Bokaro

  10. Village : Kasia Block : Ghatshila Dist- East Singhbhum Village : Barakhushi Block : Ghatshila Dist- East Singhbhum

  11. Village : Rajabasa Block : Ghatshila Dist- East Singhbhum Village : Kukocha Block : Chakulia Dist- East Singhbhum

  12. Village : Rampur Block : Lohardaga Dist- Lohardaga Village : Dangwar Block : Hussanabad Dist- Palamau

  13. Village : Nawadih Block : Dhaldhumgarh Dist- East Singhbhum Village : Khakharpata Block : Lohardaga Dist- Lohardaga

  14. RABI CROP IN RANCHI

  15. Under Hybrid Rice, 4000 ha area were brought in BGREI programme. • 140 drum seeder, 532 conoweeder has been distributed. • 170 qtls. carbondazin 50 WP distributed under IPM • 850 qtlsBorex (Na-Boret) 15% distributed under INM • 232 check dam has been constructed which will irrigate approx 5000 ha of land. • Cost of Labour Minimized. Impact of the implementation of bgrei in the state

  16. Status of monitoring of programme by crri, cuttack / other scientist

  17. VISIT OF STATE OFFICIALS/ SCIENTIST TO REVIEW BGREI PROGRAMME

  18. DISTRICT WISE FINANCIAL TARGET DURING 2012-13

  19. Details of Coverage in terms of block, panchayat, village and farmers (category wise) during 2012-13

  20. Area, Production and Productivity (APY) of different Crops during 2011-12

  21. Coverage, Production & Productivity of Paddy (Kharif)

  22. YEAR WISE SEED DISTRIBUTION * 2012-13 figures includes only Kharif only

  23. SEED PRODUCTION BY SEED VILLAGE

  24. CONSUMPTION OF FERTILIZER

  25. Targeted Area, Production and Productivity of different Crops during Kharif, 2012

  26. Deficiency in Rainfall During Kharif, 2012

  27. The water level of 20 reservoirs under Water resources Dept. are DSL/ Below DSL i.e water supply through canal is not possible in the present situation. • The water level of 10 reservoirs having 1-2 meter and can be provide supply of water once. • The water level of 19 reservoirs are having 3 meter and hence can be used as permanent source of irrigation in 41000 ha of area. Water level in Reservoirs under Dept. of water Resources

  28. COMPARATIVE Deficiency in Coverage During Kharif, 2011 & 2012

  29. Unit in MT Deficiency in Positioning of Fertilizer during Kharif, 2012 7804.2 MT Urea, 1830.4 MT DAP & 844.4 MT Complex (i.e. 4 rakes) in Transit Expected to arrive tomorrow or day after tomorrow.

  30. Timely Tie-up with agencies for input • Seed for Kharif distributed. • Shortage of fertilizer due to supply constraints. • IPM/ INM inputs tied up and distributed. • Training for SRI, Hyrbid Rice Seed done in each panchayat. • Focus of Activities under ATMA programme on Kharif season. Kharif Preparation

  31. State seed Corporation has been established. • State Seed Certification Agency has been established. • Productivity of Paddy increased from 20 to 33 qtls. • Production of Paddy increased from 34 lakhtonnes to 54 lakhtonnes. • Food grain Production increased from 42 lakhtonnes to 69 lakhtonnes. • Pulses area increased from 3.87 to 5.38 lakh ha. • Paddy procurement increased from 280 MT to more than 4 Lakh MT • Area under Rabi increased from 4 lakh to 6.60 lakh ha. • Selection of 1836 No. of VLWs • Placement of BTM (242 Nos.) and SMS ( 349 Nos.) in Blocks and Farmers Friend (15255 Nos.) at village. • 1703 Nos. of BirsaPucca Check Dam Created since 2009-10 Major Achievement

  32. Land degradation and soil erosion, soil acidity, moisture deficiency and low availability of nutrients • Erratic rainfall, lack of irrigation facilities, poor water retention capacity and permeability of the soils • Lowlands remain mono-cropped with rice, as the soils remains wet up to January. • Excessive dependence on rice in all situations makes agricultural production vulnerable to vagaries of weather. • Excessive weed pressure during kharif, particularly in direct seeded crops and adversely affects crop productivity. • Imbalanced and low use of fertilizers, particularly in grain crops, keep the production at subsistence level. • Poverty and consequent lack of risk taking capacity of the farmers leads to the exclusion of cash inputs from the production system. • Disorganized and defective marketing system with the predominance of middle men have immensely affected the profitability of farmers. Major Constraints

  33. Management of Water Resources Crop Management. Crop Diversification Integrated Farming System Managing Wasteland & bringing additional areas under cultivation. Training and Capacity Building Revamping the input supply system Strengthening of Institutional Arrangement. Monitoring and Evaluation. Prioritization of Problems

  34. 88355 qtls of Certified Seed produced with the help of Seed Village / NGOs. The Hybrid Rice area is targeted to be increased from 2 lakh to 5 lakh ha Notified Hybrid variety of Paddy (5 lakh ha), Maize (2.50 lakh ha) is targeted in 2012-13. 5 lakh ha area has been targeted under SRI. 1 Lakhs ha area has been targeted under SWI. Fallow land development programme Seed Treatment Campaign has been taken up in which awareness, distribution of seed dressing drum and seed treatment material on 90% subsidy. Major Initiatives

  35. Prepositioning of Fertilizer LD / Basic Slag for soil amendment. Construction of Godown for storage of inputs (seeds & Fertilzer) Distribution of Seed Treatment Drum for seed treatment. Empanelment of NGO (259 Nos.) Kisan Credit Card to farmers. Major Initiatives

  36. Issuance of Kisan Credit Card (KCC) to all farm families of the state is taken up in a campaign mode. 19 Lakhs Nos. of KCC is targeted to be distributed during 2012-13 Krishak Mitra are involved in the filling up of application form Condition of land position certificate relaxed for the smooth sanctioning of the KCC application form. The District / Block level functionaries are incentivize for achieving the target. Till date, 9 lakh Application are generated, 1.50 lakhs Application Sanctioned and 0.50 lakhs KCC Distributed. Kisan Credit Card (KCC) distribution status during Kharif, 2012

  37. Village haat as well as local market should be connected with pucca road. • Storage facility for food grains and cold storage facility for fresh vegetable and fruits in dominated area should be established. • Supply cool chain management should also be started in few districts for improvement in cooperative mode as well as government sector. • Processing industries should be established in cooperative mode as well as Government Sector • Procurement center especially should be opened at village level or panchayat level so that farmer can reach without facing much difficulty. Suitable Initiatives for technical and institutional support for marketing and procurement in the region

  38. Development of drought and cold tolerant varieties of crops by using the marker assist breeding and QTLs. Development of drought tolerant varieties of medium duration suiting to the cropping system of the state. Development of varieties resistant to biotic stresses (diseases and pests) by using Back Cross Method or Marker assisting Back Cross breeding method. Studies on quality of various crops by combining useful genes present in the crop species. Development of medium and tall plant type varieties with high yielding abilities of grain and fodder. Resource conservation in rice wheat cropping system. Integrated Weed Management in SRI and Aerobic Rice Cultivation. Disease and pest survey and surveillance for having up to date change in pest scenario and their status in the State. Development of disease and pest pre forecasting modules. Specific Area of strategic research on issues constraining agricultural production in the region

  39. Release of funds under RKVY/BGREI . Timely & adequate supply of fertilizers. ISSUES WITH Goi

  40. THANK YOU! 48

More Related