Download
hlt progress in cr2 n.
Skip this Video
Loading SlideShow in 5 Seconds..
HLT progress in CR2 PowerPoint Presentation
Download Presentation
HLT progress in CR2

HLT progress in CR2

94 Vues Download Presentation
Télécharger la présentation

HLT progress in CR2

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. HLT progress in CR2

  2. Present status • 6 nodes on-line connected to the read-out of one TPC sector • Participating in the TPC first and second commissioning phase • First tracks seen with the HLT on-line monitoring • Present status: debugging our fast software Clusterfinder algorithm (~4.1ms/event for Dual Opteron machine)

  3. HLT for TPC architecture In near future, CF will work in the HROC FPGA – significant saving in CPU time See thesis of J.Thader,KIP-Heidelberg

  4. Fig 1:2D view on a selected padrow Fig2: 3D view of the same padrow ClusterFinder for a Cosmic run

  5. Laser run: Front view of one TPC sector

  6. Outlook Looking forward to have this picture in our final system HLTdata challeng2006: Aliroot pp simulation, zero-suppressed, for 14TeV,0.5T