1 / 10

ASTRO-WISE workshop 17-20 Nov 03

ASTRO-WISE workshop 17-20 Nov 03. Calibration pipelines Photo-metric pipeline. Edwin A. Valentijn. Welcome. From small work visit to small workshop Flexible- meet – smell Status – OmegaCAM+VST delays; MegaCAM ingest WFI in AstroWise system AstroWise Prototype OK

dinesh
Télécharger la présentation

ASTRO-WISE workshop 17-20 Nov 03

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASTRO-WISEworkshop 17-20 Nov 03 Calibration pipelines Photo-metric pipeline Edwin A. Valentijn

  2. Welcome • From small work visit to small workshop • Flexible- meet – smell • Status – • OmegaCAM+VST delays; MegaCAM • ingest WFI in AstroWise system • AstroWise • Prototype OK • Q4 2003 class definitions • We are half way; on schedule; system is open for advanced user/developers

  3. VST

  4. This week • Calibration pipelines + QC • Photometry, bias, ff, fringe • Leading to Class definitions • Understanding how to build from Classes onwards • OmegaCAM: ESO- DMD no – ++archive • OmegaCAM: Astro-Wise very strict • WFI : Astro-Wise inherits CDF • INT : Astro-Wise inherits

  5. practical • Virgo cluster for users • Michiel Tempelaar • Agenda • Documentation • High Performance Computing

  6. VST - Virtual Survey Telescope

  7. Calibration procedures Sanity checks Image pipeline Source pipeline Calibration procedures Quality control

  8. Bias pipeline Source pipeline Flatfield pipeline Photometric pipeline Image pipeline AstroWise Pipelines

  9. Monitoring Photometric Calibrationu’ g’ r’ i’

  10. Schedule • Hardware • OmegaCEN: 3Tbyte + servers + 8 node cluster operational ۷ • OAC , USM , Terapix + CVS federation ۷ • Software • Design – review Q2 2002- ۷ • Design – formalized July 2003 ۷ • WFI +INT Prototype operational Q2 2003 ۷ • Basic operations – Q4 2003 • Evaluate and prepare for mass production 2004 • Qualify and populate 2005 • Deliver survey system – satellites

More Related