160 likes | 296 Vues
This document outlines the project status regarding the completion of various hardware and software components essential for IR and RF communication systems. Key elements include the successful integration of central computer protocols, high-level scripting languages, and user interfaces for administration and script execution. Challenges faced during PCB development, system testing, and module component evaluations are highlighted, along with safety and ethical considerations regarding IR and RF functionalities. An accurate account of time and cost involved throughout the project lifecycle is also provided.
E N D
Work Completed • IR communication(Protocol, software, and hardware) • RF communication(Software and Hardware) • Hardware(PCBs) • Pack • Tagger • Pylon • Central Computer • Script interpreter
Work Completed (cont.) • High level scripting language • Parser/compiler/linker • Remote procedural call • LCD interface • Communication between PC and devices • Ability to flash compiled script
Work Remaining • System integration • IR and timer code • Power circuit • Program Gametypes • Gui for admin and scripting front end
Problems Encountered • BDM Programmer • PCB Problems • Vdd and Vss • Foot prints • Power Circuit • Via sizes
Difficulty Testing • System testing • Incomplete hardware • Module testing • Pack, Tagger… • Component testing • ICs and passives
Demo Milestone • Protoboard Demo • Tagger • Pack • Central Computer
Compiler Testing • Test Bench
Magnitude • Project was huge • 12 hours per week to start • 25 hours per day at the end
Cost to Others • Scopes • Power Supplies • Countless parts checked out • Resisters • Caps • Programmer • Soldering Iron • Breakout Boards
Safety and Ethics • IR safety • RF safety • Low power • System failure means little • Patent research from 364