1 / 9

THEMIS dipolarisation

Pi1/Pi2 Timing in support of THEMIS: 7 th March 2007 CARISMA and THEMIS GMAG Magnetometers, Location of SCW. THEMIS dipolarisation. Raw H Pi2 filtered Pi1 filtered. ISLL Wavelet Analysis from 0551 UT. Pi1/2 timing. High frequency waves observed at 05:51:32UT

dinos
Télécharger la présentation

THEMIS dipolarisation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pi1/Pi2 Timing in support of THEMIS: 7th March 2007 CARISMA and THEMIS GMAG Magnetometers, Location of SCW

  2. THEMIS dipolarisation

  3. Raw H Pi2 filtered Pi1 filtered

  4. ISLL Wavelet Analysis from 0551 UT Pi1/2 timing High frequency waves observed at 05:51:32UT Not enough data to be definitive Onset Location east of Churchill Line ~coincident with longitude of downward FAC Down

  5. GILL GBO ASI

  6. Pi2 band (hi-pass 200 s) Pi1 band (hi-pass 40 s)

  7. Pi1B Timing Results J (T s) J (T s) Pi2/Pi1 Wavelet Coeffs: RABB 20061101 0602 UT 9 (6-1) 8 (12-3) Pi1 7 (24-6) 6 (48-12) 5 (100-24) Pi2 4 (200-48) 100 200 300 400 500 Seconds after 0602 UT

  8. CENTRE UP DOWN PiB Timing Results

More Related