I Think iCan , I Think iCan , I Think iCan

I Think iCan , I Think iCan , I Think iCan. Cmpt 275 – Assignment 1 :Project Plan By Team iCan. (Kevin Kang, Negar Shojaian, Matthew Akkerman) http://code.google.com/p/project-ican/. Role of Member. Kevin Kang : External/ Internal communications, website, general programmer.

dior
Télécharger la présentation

I Think iCan , I Think iCan , I Think iCan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I Think iCan, I Think iCan, I Think iCan Cmpt 275 – Assignment 1 :Project Plan By Team iCan. (Kevin Kang, Negar Shojaian, Matthew Akkerman) http://code.google.com/p/project-ican/

  2. Role of Member • Kevin Kang : External/ Internal communications, website, general programmer. • Negar Shojaian : web programmer. Schedule planner. • Matthew Akkerman : general programmer, software design, documentation.

  3. Project Overview • problem : In these days, people are so used about using scheduler, but often time people overestimate their ability or underestimate the amount of time needed for their task. So here it is, the scheduler that actually considers the situation and gives the best advising. • Basic idea : Just like a normal scheduler, user can enter tasks with their prefer time and length, or the user can just enter the length and the scheduler will deicide a time for the task. The special thing about this intelligent scheduler is that it arrange the tasks not just by the time and length, time for transportation but also the users' tiredness, stress and task type(work, leisure, priority, etc...).

  4. Way to do it : The first the user use this software, he/she will be asked a series questions so the software can figure out how much physical tiredness and stress the user can endure. When user enter a task, the user will enter the task's name, length, prefer time, due time, level of physical tiredness, and mental tiredness (tiredness). The scheduler will now star to arrange the tasks by the level of trimness of each tasks and the level the user can endure. In the end of week, user will be asked to give feedback to the scheduler about how they feel about the schedule(too tired, too easy, etc...). The scheduler will change the level of endure of the user by the user feedback. • Stakeholder : That will be almost everybody. People with bad time management may feel specially helpful with this software • User : People with BTMS (Bad Time Management Syndrome), want to make more efficient use of their time, and have more flexible working/school scheduler.

  5. Project Design

  6. Plan Diagram

  7. Project Schedule

  8. Risk Analysis

  9. Revision History(expected)

  10. Meeting • Date : May 16, 2009 • Time : 5:00 pm ~ 7:00 pm • Location : SFU Downtown • Decide everybody's role for this assignment. • General design of our software. • Time : May 18, 2009 • Time : 11:00 am ~7:00 pm • Location : Starbuck • combine every member's work, • going through the details. • Integration and finalize assignment 1.