1 / 5

SC-214/WG-78 SG-3 Status of INTEROP Standards Output Plenary 7

SC-214/WG-78 SG-3 Status of INTEROP Standards Output Plenary 7. Plenary #7: 30 March – 3 April 2008 Scottsdale, U.S.A. Claudia Chitty - Frédéric Picard. INTEROP: P7 Output Status. 11 new comments at P7 70 comments addressed + 60 PICS comments closed. ATS INTEROP: Open Issues.

Télécharger la présentation

SC-214/WG-78 SG-3 Status of INTEROP Standards Output Plenary 7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC-214/WG-78 SG-3Status of INTEROP Standards Output Plenary 7 Plenary #7: 30 March – 3 April 2008Scottsdale, U.S.A Claudia Chitty - Frédéric Picard

  2. INTEROP: P7 Output Status 11 new comments at P7 70 comments addressed + 60 PICS comments closed

  3. ATS INTEROP: Open Issues • Comment #517 • Removal of Aircraft ‘ttr’ Timer Issue • Comment #519 • DSC Air-initiation required for D-TAXI arrival information ? • Air initiation at any time • D-TAXI arrival information request/response transit through ER CDA • Sub-service available only after ER CDA to TMA CDA transfer of comms • Comment #567 • Are the [route clearance] parameters different/same for UM and DM ? • Comment #568 • New UM ACL-1/2 SPEED SCHEDULE different/same for ACL and 4DTRAD ? • Comment #590 • Clarification of a D-TAXI requirement

  4. INTEROP: WP1 Future Work • ATS INTEROP • Inclusion of resolved issues (48) • Jointly with Integrated team • Conf call: 27-30 April • FANS INTEROP • Accommodation of new DCL parameters • Impact of resolved SPR/ATN INTEROP issues (125) • PICS • Impact of resolved SPR/ATN INTEROP issues (125) • Release on 24th April 09 • Status telcon on the 17th April 09

  5. ATS INTEROP: WP2 Future Work • Deliverables for 4DTRAD/FLIPINT: • ATS INTEROP over ATN • ADS-C PICS • PM-ADS Specifications • No FANS accommodation • Baseline: 4DTRAD OSD output P7 • Traceability • First Draft by Plenary 8 First Draft 1.0 0.1 0.2 0.3 INT sub-group 4 Sep P7 April P8 21 Sept 8-12 June SG Meeting 6-10 July Telecon 24-28 Aug SG Meeting

More Related