1 / 10

OVERVIEW OF THE U.S. ARMY UNIQUE IDENTIFICATION (UID) IMPLEMENTATION STRATEGY

OVERVIEW OF THE U.S. ARMY UNIQUE IDENTIFICATION (UID) IMPLEMENTATION STRATEGY. UID SUMMIT Ft. Belvoir, VA November 17, 2004. Presented by: Mr. Benjamin B. Morgan, RN HQDA G-4 (DALO – SMI) morganbb@hqda.army.mil (Voice) 703-692-9577 (Fax) 703-695-6173. Concept of Operations

Télécharger la présentation

OVERVIEW OF THE U.S. ARMY UNIQUE IDENTIFICATION (UID) IMPLEMENTATION STRATEGY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OVERVIEW OF THE U.S. ARMY UNIQUE IDENTIFICATION (UID) IMPLEMENTATION STRATEGY UID SUMMIT Ft. Belvoir, VA November 17, 2004 Presented by: Mr. Benjamin B. Morgan, RN HQDA G-4 (DALO – SMI) morganbb@hqda.army.mil (Voice) 703-692-9577 (Fax) 703-695-6173

  2. Concept of Operations Life Cycle Managers/Depots Contractor Single Process Initiatives (SPI) AIS Integration Challenges AGENDA B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

  3. Spiral Development Process: Include UID policy in overarching Army Regulation (AR) on Automatic Identification Technology (AIT) Develop scenarios describing how UID will be used operationally Identify target business processes, e.g., UID supports serial number tracking (SNT) Identify stakeholder responsibilities (all classes of supply, all Army communities) Training Issue support plans and prioritized marking schedule Require suppliers to mark items prior to delivery; mark legacy items as rapidly as possible Identify and institutionalize metrics and performance measures for UID Work with other Services, defense agencies, and industry to resolve common issues and evaluate success UID part of program reviews Maintain outreach program CONCEPT OF OPERATIONS - THINGS ARMY NEEDS TO DO - B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

  4. Lifecycle management processes will be primary beneficiaries of UID Only approved activities will mark legacy items Capturing the movement of an individual UID through its lifecycle has potential to quantify system performance Design activities define marking requirements. Technical data packages will ensure future buys or repair contracts contain marking and reporting requirements – as appropriate Optimizing benefits of UID requires a multi-functional approach UID supports replacement of some contact memory buttons (CMB) applications with data matrix markings UID pilots are underway in Army LIFE CYCLE MANAGERS/DEPOTS B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

  5. Commercial outreach program during transition period is critical to success Outreach program helps suppliers align internal corporate and business unit policies and pricing to accommodate UID Suppliers starting to recognize UID provides business efficiencies and competitive advantage Major costs are non-recurring engineering work, software changes, and technology investment – not part marking Joint operations require “Best Value Analysis” to standardize marking methods Army will assist Defense Contract Management Agency (DCMA) with development of guidelines related to mark quality and permanency Army helped develop National Defense Industrial Association (NDIA) training syllabus Army participates on the Joint Aeronautical Commanders’ Group (JACG) UID Working Group CONTRACTOR SINGLE PROCESS INITIATIVES (SPI) B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

  6. UID requirements will be included in Army’s Enterprise Resource Planning (ERP) software baseline capability The sharing of UID data between Services requires standardized business practices, data syntax, and format UID enables the link between the product and install dates, removal dates, and decisions to repair or replace broken items UID requirements are included in Army Working Capital Fund (AWCF) POM FY06 – FY11 System-wide benefits of UID depend on information exchange through AIS; connecting Army logisticians is top priority Future systems will incorporate UID data and support evolving policies and Joint system integration Current Army Standard Army Management Information Systems (STAMIS): Cease operation once ERP solution fully fielded OSD requires return on investment (ROI) for system upgrades over $1M ROI validation difficult before legacy system shutdown AUTOMATED INFORMATION SYSTEM (AIS) INTEGRATION B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

  7. Life Cycle Management Commands (LCMC) and Program Executive Offices (PEO) must act in concert to promote data interoperability and equipment standardization Need consistent approach for marking items whose cost cycles above and below $5K UID threshold Packaging requirements – including passive RFID - need more definition Potential for uneven implementation across Army communities and Joint arena UID requirements and “Best Business Practices” must be incorporated into the Single Army Logistics Enterprise (SALE) UID may affect contract price and schedule Current and future Army networks must be scaled to accommodate pervasive use of UID Major challenge is to define best use of UID data to support transformation of Army logistics processes - marking items is not enough CHALLENGES B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

  8. BACK-UP SLIDES

  9. G4 Strategy Map Core Competencies Sustain the Force Enduring and Essential Capabilities Soldier Readiness Unit Readiness Equipment Readiness Modernize Theater Distribution Processes Improve Force Reception Connect Logisticians Integrate Supply Chain Military/DA Civilian Development Program Learning & Growth Resources People, Dollars, Infrastructure, Installations, Institutions(I3), Materials, Supplies and Time B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

  10. “CONNECT” OUR LOGISTICIANS • Agile, Assured, 24 / 7 Data Capability into the Enterprise • Plug / Un-plug as Required • Enable “Sense and Respond” Logistics • Include Log, Per, Med & Eng (Operational Sustainment) • MODERNIZE THEATER DISTRIBUTION • Single Proponent • Enable Control With 100% Visibility • Single Doctrine, Force Structure & Training • IMPROVE FORCE RECEPTION • APOD / SPOD; Distribution; Life Support • Strategic Connectivity - Theater Log C2 Node • Embedded Sustainment Capability • Life Support – Division in 5 Days • INTEGRATE THE SUPPLY CHAIN • Single Proponent • Eliminate Stovepipe Suboptimization Army FOCUS SPEED & PRECISION • CRITICAL TO SUCCESS • Our Commitment • Joint Integration • Policy Modernization • Refined Doctrine • New Force Structure • Standards and Discipline B. B. Morgan/DALO-SMI (703-692-9577), DSN 222-9577, morganbb@hqda.army.mil

More Related