Download
researcher project manager n.
Skip this Video
Loading SlideShow in 5 Seconds..
Researcher = Project Manager PowerPoint Presentation
Download Presentation
Researcher = Project Manager

Researcher = Project Manager

99 Vues Download Presentation
Télécharger la présentation

Researcher = Project Manager

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Researcher = Project Manager • Manage project resources to achieve deliverable (experiment) • supplies, equipment, fabrication, external vendors, staff, and other researchers • Before coming to Davis • Scheduling • Autocad / drafting • Mathcad (recommended) • Machine shop / hand tools • wiki • At Davis • Labview (required) • Forklift driving • Electronics • instrumentation CGM Wiki at nees.ucdavis.edu

  2. Scheduling / planning • 3 months before test schedule is set – complete diagram of experiment and instrumentation • 1 month before test – all fabricated structures

  3. Page 2 of 3 Drafted on 8/11

  4. Displacement Transducer Rack Mounted on Container Above Model