AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik. What is SHRP2?. Save lives. Save money. Save time. $ 218 million, federally funded research program to address critical transportation challenges: Making highways safer Fixing deteriorating infrastructure
E N D
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012Kevin Chesnik
What is SHRP2? Save lives. Save money. Save time. • $218 million, federally funded research program to address critical transportation challenges: • Making highways safer • Fixing deteriorating infrastructure • Reducing congestion • Collaborative effort of AASHTO, FHWA, and TRB • Aims to advance innovative ways to plan, renew, operate, and improve safety on the Nation's highways
Focus Areas Safety: fostering safer driving through analysis of driver, roadway and vehicle factors in crashes, near crashes, and ordinary driving Renewal: maintaining and repairing the deteriorating infrastructure using already-available resources Reliability: managing non-recurring events to create more predictable travel times Capacity: building a highway system that creates minimum disruption and meets the environmental, and economic needs of the community.
Research to Implementation Implementation Research and Development
Efforts are Collaborative • Implementation is cooperative. It engages: • AASHTO • FHWA • SHRP2/TRB staff • States are the customers of AASHTO implementation • FHWA, TRB also serve locals, academia, MPOs
SHRP2 Plan of Action • Research (2007 - 2013) • 100+ research projects • Administered by TRB • Transition (Now through 2015) • Pilots and demonstrations • Testing and refinement of products emerging from research • Implementation (2012 - forward) • Partner agencies prioritize products for implementation • Selected products integrated into current transportation practices
2012 Starts • Project Management Tools $0.5M • R09 Managing Risk in Rapid Renewal Contracts • R10 Managing Complex Projects • R04 Bridge Designs for Rapid Renewal (2011)$4.2M • R26 Preservation on High Volume Roadways (2011) $3.2M • L12 Training for Traffic Incident Responders (2011) $4.4M • Organizing for Reliability $6.6M • L31 CEO Workshop on Operations (2011) • L17 Knowledge Transfer System • L06 Organizing Agencies for Systems Operations and Mgt. • L01 Business Processes for Reliability • C06 Integrating Ecosystem & Highway Planning $1.5M $20.4M
2013 Starts – Estimated • TCAPP $6 – 7M • C01 TCAPP • C02 Performance Measures • C19 Expedited Project Delivery • R07 Performance Specs for Rapid Renewal $.2 –.5M • R15B Integrating Utility/Transportation (2011) $2 – 3M • R16 Railroad Agreements (2011) $1 – 2M • R23 Long-Life Pavements(2011) $1 – 2M • R06 Web Tool for Non-destructive Testing $1 – 2M Estimated costs~ $14M
2014 Starts - Estimated • Economic Impact Tools $1 – 2M • C03 Economic Impact Case Studies • C11 Economic Impact Analysis Tools • C10 Travel Demand and Network Models $3 – 4M • C15 Freight Planning Guide $1 – 2M • Reliability Analysis Tools $3 – 4M • L02 Monitoring Programs for Reliability • L05 Planning/Programming for Reliability • L08 Reliability in the Highway Capacity Manual • L36 Regional Operations Forum $.5 – 1M • R19A Bridges Beyond 100 Years $1 – 2M • Pavement Technologies • R05 Modular Pavement Solutions • R21 Composite Pavement Systems TBD Estimated costs ~ $11M
SHRP 2 ADDITIONAL FUNDING • 40 States have voted to support funding for SHRP2 per the language in MAP-21 resulting in an approximately $75M additional funding. 2/3 of this funding is targeted to be returned to the states in the form of demonstration funding.
Knowledge Transfer Workshops Implementation Planning Workshops Engages stakeholders from state and local DOTs, AASHTO Committees, the industry, FHWA, TRBand others Identifies target audiences, strategies, tactics, marketing plans and budgets Outreach to AASHTO Committees Development of Lead State Demonstration Projects Information Technology Product Development Implementation Activities
IPW’s completed/scheduled for: R05 Modular Pavements R09/10 Complex Project Management and Risk Review C06b Integrating Ecosystems in Planning Reliability Bundle (Sept19) R04Bridge Design for Rapid Renewal (Sept 24-25) R15b Integrating Utilities in Planning (Dec 4-5) R16Model RR Agreements Dec/Jan
R 16 Railroad Agreements • R 16A and R 16B led by Shobna Varma (TRB lead research) Pilot efforts • Transition to R16 Deployment activities (AASHTO led Deployment-Kevin Chesnik) • FHWA involvement (Jon Obenberger) • IPW kickoff meeting Target date December 2012 (Include many of the same team from the April Mtg)
Get Involved • Become a lead state or product champion • Watch for pilot project and demonstration opportunities • Engage in peer-to-peer exchange programs • Participate in focus groups, surveys and other product research • Subscribe to SHRP2 news at www.TRB.org/SHRP2/news • Learn about research requestsfor proposals (RFPs) from TRB
Questions? Stay informed and stay tuned! Jim McDonnell Kevin Chesnik Program Director, Principal Engineer Engineering SHRP2 Implementation AASHTO ARA jimm@aashto.orgkchesnik@ara.com For more information: www.trb.org/SHRP2